***** NOTICE *****
To: All Pier 8 Owners
From: The ALCOR
Group, Property Management
Date: July 22, 2010
Subject: Pier 8 - Pest Control notice - Saturday morning, July
31, 2010 panels
Caballero Pest Control will be on the property to provide the quarterly
pest control treatment on starting at 9:30 a.m., Saturday, July 31,
2010. Caballero will once again provide two (2) men in hopes of ensuring
that all Units are serviced in the shortest time possible. As usual,
Owners will need to ensure that someone (an Owner, their tenant, their
neighbor or other representative) will be present for their effort
to be successful.
They will once again start one man on the 1st floor and the second
man on the third floor; they will work their way to the second floor
to complete the service. Our best estimate is that they will begin
the second floor at about 11:00 am or so in hopes of being done no
later than 1:00 p.m.
As usual, Mr. Caballerio will be providing us with a list of those
Units that are actually treated that day. This will of course also
inform us as to which Units were NOT able to be treated due to lack
of anyone being present to provide access into the Units. Please make
arranges to have the Unit accessible for treatment. We will also post
this notice in the bulletin board across from the mailboxes and in
each elevator. In addition, a copy of this notice has been placed
on the Pier 8 website Bulletin Board for future reference.
Thanks in advance for your assistance regarding this matter.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Pier 8 Owners and Tenants
From: The ALCOR Group and
your Board of Directors
Date: July 15, 2010
Subject: Pier 8 - Suggested inspection - GFI and Electrical
panels
During a recent home inspection of a Pier 8 Unit, the home inspector
pointed out the use of Federal Pacific Stab Loc style electrical breakers
and panels within this Unit and Pier 8 in general. A subsequent test
revealed a bad (burnt-up) GFI breaker that posed a safety hazard.
While this may be an isolated instance, we would rather err on the
side of caution by bring it to the attention of Pier 8 Owner's.
Over the years, there has been much written about these types of
breakers and panels relative to potential safety/fire issues. To date,
we have not seen or heard that anything that state these types of
panels/breakers "must be replaced" or that it is "mandatory"
to remove and or replace these. My belief is that, if there were a
definite, known safety issue with these panels, local and/or State
codes would dictate that they be replaced.
Be that as it may, during the recent inspection and testing of the
GFI breaker in the Pier 8 Unit, it was determined that the breaker
failed to trip as designed; apparently the GFI was burnt up as we
understand it. With that in mind, Management and the Board feel complied
to strongly suggest that Owner's may want to consider having their
interior electric panel and breakers check to ensure that you do not
have any malfunctioning panels or breakers. While there may not be
any issues with your panel(s) or breaker(s),once again, we would rather
err on the side of condition and bring this recent incident to your
attention so that you can make and informed decision regarding the
potential inspection of the system within your Unit(s).
As always, should you have any questions or desire additional insight,
please let me know and we will be happy to assist in any reasonable
way possible.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Pier 8 Owners and Tenants
From: The ALCOR Group and
your Board of Directors
Date: July 8, 2010
Subject: Violation of Association Rule and Regulations in Common
Areas
We hope all enjoyed their 4th of July holiday; unfortunately, the
weekend at Pier 8 was not without event. In the past couple of days,
we have received more complaints concerning the pool and common area
violations.
Specifically, we still have a few individuals who persist in violating
rules pertaining to the pool area. As a result of the complaints and
Owners willing to identify those individuals, fines have been issued.
In hopes of avoiding having to issue any more fines, we wanted to
send out one last plea with the remaining few offenders that violations
of Pier 8 rules and regulations in general will not be tolerated.
The following is a brief list of some of the reoccurring violations:
- Pool hours are 9:00 a.m. to 11:00 p.m.
- Only two (2) guests per Owner is permitted within the pool area
at any given time. Any gatherings larger than that require two (2)
weeks prior written notice/approval to/from the Association. This
applies to gatherings that involve all common areas as well.
- No glass containers or similar items are permitted within the fenced
in pool area due to the obvious safety issue it would create; no exception
will be made.
- Please ensure that any radios and/or similar devices are not turned
up so loud that they disturb Owners inside their Units, especial during
later evening hours. The placement of speakers from Units into the
common areas and/or pool area is not permitted at all.
- Foul or offensive language anywhere in the common areas will not
be tolerated.
- Pets are not permitted inside the gated area.
- Everyone should make a concerted effort to pick after themselves
when leaving the pool.
Complaints of parking violations within the gated area have also
increased in recent weeks. Please, do not park in spaces belonging
to other Owners or Tenants. There is no guest parking within the gated
area. Signs have been posted advising all that violators will be towed
at Owner's expense and Owners are entitled to call the tow company
to have vehicles towed if someone is parked in their space.
Majority of Owners and Tenants have clearly stated that they will
not tolerate those who insist on continuing these practices at Pier
8 while in the common areas and Management will continue to issue
fines to violators accordingly. With that in mind, we are making one
more plea those involved o be considerate of your fellow Owners and
Tenants and everyone's cooperation to the end would be greatly appreciated.
Thank you in advance for your cooperation in the weeks and months
ahead.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Pier 8 Owners and Tenants
From: The ALCOR Group and
your Board of Directors
Date: June 28, 2010
Re: Water turn off - Plumbing work in Unit 308
**** WATER CUT OFF NOTICE ****
We have an Owner in Unit 308 who needs to make a plumbing repair.
The job has been scheduled for this coming Wednesday morning, June
30. With that in mind, the following Units should be the only one
effected by this cut-off from 9:00 am to 10:00 am this coming Monday,
they are:
Units 106,107,108,109, 206, 207, 208, 209, 306, 307, 308, 309.
In case they run into problems and need to turn-off water to other
Units to complete this repair, we wanted to at least advise everyone
of the planned outage, just in case. Should you require additional
information, please let us know.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Pier 8 Owners and Tenants
From: The ALCOR Group and
your Board of Directors
Date: June 24, 2010
Re: Water turn off - Plumbing work in Unit 323
**** WATER CUT OFF NOTICE ****
We have an Owner in Unit 323 who needs to make a plumbing
repair. The job has been scheduled for this coming Monday morning,
June 28. With that in mind, the following Units should be the only
one effected by this cut-off from 9:00 am to 10:00 am this coming
Monday, they are:
Units 118,119,120,121,122, 223, 224, 225, 226, 227 323, 324, 325,
326 & 327.
In case they run into problems and need to turn-off water to other
Units to complete this repair, we wanted to at least advise everyone
of the planned outage, just in case. Should you require additional
information, please let us know.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Pier 8 Owners and Tenants
From: The ALCOR Group and
your Board of Directors
Date: June 22, 2010
Re: Unexpected water turn off- City of New Orleans
As you may already know, the water has been unexpectedly turned off
to in the Pier 8 area this morning around 10:30 am. Since the water
appeared to be off in all Pier 8 buildings, we suspected another unscheduled
City turn off. We called the City and have learned that they have
an issue with the main water line on Fleur De Lis that is more than
likely the result of the outage in and around Pier 8. Unfortunately,
they do not have a time (at this point) as to when the problem will
be resolved and water turned back on; they stated it could be all
day.
While it is obviously beyond any of our controls, we wanted to at
least attempt to advise everyone as to what we have learned thus far
concerning this matter. If we obtain any further information, we will
of course notify you as quickly as possible. In the meantime, I appreciate
any information anyone else may gain on the outage.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Pier 8 Owners and Tenants
From: The ALCOR Group and
your Board of Directors
Date: June 7, 2010
Re: General Reminders
Water turn offs to any building(s) - Except in case of absolute
emergencies involving water leaks that will result in immediate damage
to property, no water should be turned off without first obtaining
written permission from the management office. Anyone turning water
off otherwise will be subjected to the mandated fine under your rules
and regulations.
Dogs/Leash - Pets must be on leash within the common area.
Having a pet inside of the fenced in pool area is strictly prohibited.
ABSOLUTELY NO PETS ARE ALLOWED IN ELEVATORS.
Pool Area - Pool hours are 9:00 a.m. to 11:00 p.m. No glass
containers or items are permitted within the fenced in pool area due
to the obvious safety issue it would create; no exception will be
made. Please ensure that any radios and/or similar devices are not
turned up so loud that they disturb Owners inside their Units, especial
during later evening hours. Use of foul or offensive language anywhere
in the common areas will not be tolerated.
Parking - All parking spaces inside the fenced in area are
reserved/rented by individual Unit Owners. Please do not park in any
space other than that which you are entitled to. Offenders will be
subjected to being towed at Owners expense without any further notice.
Trash - When disposing of trash in the common area trash cans
or dumpster near the exit gate, please ensure that all trash is place
INSIDE the containers as there is no daily janitorial service charged
with the pick-up of such trash. You assistance will go a long way
to keeping the common areas presentable between weekly janitorial
visits and will assist in controlling the expense of such services.
Signs - No signs of any kind may be placed anywhere on the
common areas.
Please be considerate of you fellow Owner, Tenants and their guests
so that all may enjoy their time at Pier 8! Thanks in advance for
the cooperation and assistance.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of The Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: April 19, 2010
Subject: Pest Control - Saturday, May 1, 2010 from 9:30 a.m.
to 1:00 p.m.
****** NOTICE ******
(NOTICE IS ALSO POSTED ON WEBSITE BULLETIN BOARD)
Pest Control Service Scheduled
- Saturday, May 1, 2010
Starting at 9:30 a.m. to 1:00 p.m.
Caballero Pest Control will be on the property to provide the quarterly
pest control treatment on Saturday May 1, 2010. FIRST AND FOREMOST,
THEY WILL HAVE TWO MEN DURING THIS VISIT IN AN EFFORT TO ENSURE ALL
UNITS ARE COMPLETED IN THE SHORTEST TIME POSSIBLE.
They will once again attempt to visit and treat all 77 Units however
someone (an Owner, their tenant, their neighbor or other representative)
must be present during those hours for this effort to be successful.
This time, we will have one man start on the 3rd floor and the other
on the first floor and will then both go to the second floor to complete
the service. Our best estimate is that they will begin the second
floor at about 11:00 am or so in hopes of being done no later than
1:00 p.m.
As usual, Mr. Caballerio will be providing us with a list of those
Units that are actually treated that day. This will of course also
inform us as to which Units were NOT able to be treated due to lack
of anyone being present and providing access into the Units. Please
make arranges to have the Unit accessible for treatment. We will also
post this notice in the bulletin board across from the mailboxes and
in each elevator. In addition, a copy of this notice has been placed
on the Pier 8 website Bulletin Board for future reference.
Thanks in advance for your assistance regarding this matter.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
******************************************************************************************
To: Owners of The Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: April 8, 2010
Subject: A/C Unit Preventative Maintenance & use of Pool
Area reminders
Air Conditioning (a/c) units - With Spring upon us,
your air conditioning will begin being used again and we recommend
taking a moment for a cost saving preventative measure. This would
be a good time to add about 1/2 cup of bleach to those a/c drain lines
in the interior closet unit (evaporator) portion of your a/c system.
After not being used all winter long, algae will often build up in
the drain lines. Once the a/c units start being used, the draining
water wets that algae and the algae sometimes builds up and clogs
your drain line leading to an overflow situation in your attic or
closet. If the line is not kept clear and it overflows, it often results
in damage to your flooring and/or the ceiling of Unit below you.
Usually, there is a white PVC line coming out of the front/base of
the closet unit. Most a/c contractors installed a short vertical line
with a cap on it; this is where the ½ cup of bleach can be
poured into the drain line. With Pier 8 being a three story system,
it is extremely important that the 3rd floor Unit Owner ensure that
they, in particular ,take a moment to complete this preventative measure
as this is really the only "entry point" in the system that
will ensure the entire vertical line going to the ground gets serviced.
Should you have any questions regarding this suggestion, please drop
us an e-mail and we will try and answer it for you.
Use of Pool - With spring here and summer around the
corner, we will see an increase in use of the pool area. We want to
remind everyone of a few rules that will help "head-off"
a few normal issues that occur during this use.
- Pool hours are from 9:00 am to 11:00 pm. No one should be in the
pool after 11:00 p.m. and noise must be quite to a minimum so as not
to disturb other Owners and any one under the age of 18 must be accompanied
by an Owner while in the pool area.
- Please do not bring any glass containers or glasses/cups into the
pool area as it possesses the chance of being dripped and someone
getting cut by the glass .
- Use of foul language is not permitted in the pool or common areas.
- Barb-q pits should be turned off when you are finished using them.
Barbecuing is only permitted in the pool area using the pits that
have been provided by the Association. Barbecuing on balconies or
walkways is not permitted. The only exception to this basic rule involves
the front ground floor fenced in patio area; barbecuing is permitted
in those areas.
- There are only 2 guests per Owner allowed in the pool area. If anyone
is expecting more than 2 guests at any given time or planning a get
together with a larger group, you must submit the notice/request to
the Management office and gain approval prior to the gathering.
- Smoker, please use the ashtrays and do not depose of cigarette butts
on the ground.
- We need everyone help in keeping the area clean between visits by
the janitorial crew so please ensure that you depose of any waste
in the trash containers before leaving the pool area.
- Hanging of towels or swimsuits and similar items on front r rear
railings is not permitted.
With the cooperation or everyone, Owners and guest of Pier will be
able to enjoy the pool area so we hope everyone will assist us in
MAKING IT HAPPEN!
Thanks for the help and we hope everyone has a great Spring/Summer!
Please please let us know if we can be of any assistance.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: Carolyn Webre #322 via the Management Office
Date: April 7, 2010
Subject: LCIA Neighbors Block Party
********* Event Notice*********
As part of the Lakeview Civic Improvement Organization (LCIA), I
will be hosting a Meet & Greet your Neighbors Block Party Saturday,
April 17 from 1pm - 3pm at West End Park. LCIA is encouraging everyone
to have a Meet and Greet in their neighborhood to enjoy the Spring
weather and celebrate the great community spirit so unique to Lakeview.
It is also a good time to invite some old friends who might have moved
away to come see what's happening. We have come a long way BABY!
The LCIA will be providing crawfish for the block parties taking
place all over Lakeview. Anyone that has a questions please contact
Carolyn Webre @ 504-427-2983 or email carolyn.webre@selu.edu I am
requesting that each person Bring a Dish or one of the products listed
below:
1-10 pack of paper towels
potato salad
4 large bags of potato chips
Jambalaya
4- 2 liter soda products
cookies
hot dogs
paper products
beer
Tables and Chairs (Everyone brings their own chair)
other picnic like items
Water
Please RSVP by April 15th.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: Board of Directors
Date: March 19, 2010
Subject: Pier 8 - Friends of Westend Notice
************Friends
of Westend Notice *************
(Event to be held on Saturday March 27, 2010)
The Friends of West End cordially invites you to a party
to support the efforts to revitalize and beautify all of
the greenspaces located at West End. informational plans and displays
will be on hand.
Food provided by local restaurants.
Raffle with over $1,000 worth of items and gift certificates.
Cash Bar
Location:
The New Orleans Yacht Club
401 N. Roadway - West End
Saturday, March 27th
7:00pm
$25 donation
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group, Property Management
Date: February 28, 2010
Subject: Pier 8 - Owner's Annual Meeting and Elections February
23, 2010
We wanted to provide everyone with a brief overview
of the recent February 23, 2010 Pier 8 Annual Owner's Meeting and
Election results.
The meeting opened a bit late as we did not have the required number
of Owner's present to open the meeting at 6:30 p.m. Once open, the
usual house cleaning issues were addressed and the Officers introduced
themselves. Proof of meeting notice to Owner's was presented and proxies
were called for and certified at the sign-in desk.
Nominations were taken and an election was held to fill the vacancy
of one (1) Director's position. Susan "Sue" Wilson was elected
to serve the remaining two (2) year term of that position. The 2010
Pier 8 Board of Directors consists of:
Jason Faucheaux - President (term exp. 2.2012)
Sven Oertel - Vice President (term exp. 2.2011)
Lisa Kayser - Secretary (term exp. 2.2011)
Rachel Mathieu - Treasurer (term exp. 2.2012)
Susan "Sue" Wilson - (formally elected on 2.23.2010 - term
exp. 2.2012)
A year-end update of Pier 8 Income and Expenses was presented to all
in attendance as well as well as the adopted 2010 Budget and current
financial condition. Hand out's included current balance sheet, current
comparative income and expense sheet and 2010 Budget. A copy of the
current aged Receivables & Delinquency Report was also provided
at the sign-in table for review by all. Mr. Jerry Sullivan (the Associations'
counsel) gave a brief overview of legal collection efforts regarding
the current $70,000.00+ owed to the Association by Owner's by a hand
full of Owners. Legal pursuit of these Owners continues; one Unit
is being processed towards a Sheriff Sale and we expect that this
one will occur within the coming two (2) months, subject of course
on the Sheriff's scheduling of this action.
The Association had an unexpected issue arise just days before the
Annual Owner's Meeting that significantly altered the intended agenda/focus
the meeting. The Mr. Sullivan, had received notice from an Owner's
attorney advising that an outstanding check in the amount of $47,723.14
issued under prior management on February 28, 2008 to his client for
Katrina related damage had apparently never been cashed by the Owner
leaving the Association with a liability of $47,723.14. A complete
presentation of documentation evidencing this fact was presented to
the Membership and a lengthy discussion of related facts followed.
In brief, prior management had apparently failed to enter the check
into their accounting system resulting in no record of the check other
than the copy in the Owner's file and the correspondence of the check
being transmitted to the Owner by Mr. Sullivan on March 3, 2008. At
the time of the Annual Owner's meeting, Mr. Sullivan and the Owner's
attorney had not spoken regarding a solution as the Board wanted to
present the issue to Owner's prior to Mr. Sullivan responding to the
Owner's counsel regarding a proposed solution arrived at by the Board
during a recent emergency Board meeting regarding the matter. While
the Board has arrived at a proposed solution, it was agreed that it
would not be discussed at the meeting until the respective attorneys
had a chance to discuss and arrive at a mutually agreeable arrangement
to make payment of the funds needed to resolve the matter. An update
on this issue will be provided as soon as a formal solution has been
agreed upon.
Given the aforementioned unexpected issue/liability, discussion of
walkway renovation was limited pending the outcome of the newly discovered
matter. A presentation was made of the cost of a new sign at the entrance
to Pier 8 to replace the current sign. The estimates were in the $2,000.00
range however, this too was deferred for a later date.
There were proposed changes to rules and regulations on the agenda
to be presented by Mr. Mintz/Mr. Bassett, Mr. Bimes and Ms. Landry
however, it was motioned by Mr. Bassett that they be tabled until
they could be presented and considered at perhaps a Special Owner's
meeting in the near future when more Owner's would be present; all
present agreed.
Needless to say, while the meeting was orderly, it was not as productive
as all would have liked. It was agreed that not much could be resolved
until an agreement is reached concerning the newly discovered outstanding
check. Rest assured that you Board, Management and Counsel will do
everything reasonably possible to move this issue along as quickly
as possible so that we can resume focusing on continued improvement
of Pier 8 for all in the weeks and months ahead.
Trusting this meets with the approval of all, should you have any
questions or require additional information, please feel free to call
the Management office or drop us an e-mail and we will respond accordingly.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of The Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: February 23, 2010
Subject: FINAL Annual Owner's Meeting Notice - The Pier 8 Condominium
Association, Inc.
*** FINAL ANNUAL
OWNER'S MEETING NOTICE ***
Annual Owner's Meeting, Tuesday, February 23, 2010, 6:30 p.m. to 8:30
p.m.
(e-mailed and posted on web morning of February 23, 2010)
Please accept this as your final notice that the Annual Owner's Meeting
& Election will be held at the New Orleans Yacht Club at 403 N.
Roadway, New Orleans, Louisiana TONIGHT, Tuesday, February
23, 2010; doors will open at 6:00 p.m. and the meeting will begin
at 6:30 p.m. sharp. A copy of the previously mailed information/notice
(including proxy form) can be found below in the February 4, 2010
posting.
As a reminder, please remember that your Rules and Regulations require
that there be at least 33-1/3% of the Owners represented (in person
or by Proxy) at the meeting in order to hold this meeting. With that
in mind, it is again imperative that as many Owners as possible attend
this meeting. As further outlined by your Rules and Regulations, any
Owner whose account is over 30 days past due will not be permitted
to vote nor are they permitted to hold office as a Director, so we
encourage everyone to please bring any such accounts current prior
to the meeting night.
We look forward to seeing as many Owners as possible at tonight's
meeting and thank you in advance for your support in the weeks and
months ahead as we continue to improve Pier 8.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
The formal notice of the 2010 Pier 8 Annual Owner's
Meeting and attachments have been placed in the mail so Owners should
begin receiving it over the next few days. While a copy of the cover
letter can be reviewed below, if you would like a complete copy of
the mailing now, simply "click" on THIS
LINK and a complete downloadable/printable copy will appear in
PDF format. Hope to see you at the meeting!
To: Owners of The Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: February 4, 2010
Subject: Annual Owner's Meeting Notice - The Pier 8 Condominium
Association, Inc.
Please accept this as formal notice that the Annual Owner's Meeting
& Elections will be held at the New Orleans Yacht Club at 403
N. Roadway, New Orleans, Louisiana on Tuesday, February 23, 2010;
doors will open at 6:00 p.m. and the meeting will begin at 6:30 p.m.
sharp.
A Proxy/Nomination form has been included here for your use in case
you are not able to attend the meeting; simply follow the instruction
on the form. The Proxy/Nomination form can be returned to our office
as indicated on the form or brought to the meeting by your representative.
In addition to this notice, a copy of the proxy/nomination form and
this notice will also be available on the Pier 8 Condominium website
at www.pier8condos.com via the Bulletin Board link on the home page.
These efforts are aimed at reaching as many Owners as possible in
hopes of achieving the highest attendance possible.
Your current Board of Directors/Officers are Jason Faucheaux, President
with a remaining two (2) year term, Sven Oertel, Vice President with
a remaining one (1) term, Lisa Kayser, Secretary with a remaining
one (1) year term and Rachel Mathieu, Treasurer with a remaining two
(2) year. Buzzy McFerrin had also been elected in 2009 as a 5th Director
to a three (3) year term. Unfortunately Buzzy had to resign in 2009
for personal reasons. Following that resignation, the Board appointed
Susan "Sue" Wilson to fill that position until the upcoming
Owner's meeting. With that in mind, there will be one (1) Director's
spot open for election at the upcoming Owner's meeting. We encourage
anyone who would like to run for a Board position to enter their name
into nomination as soon as possible. Of course nominations will be
accepted from the floor on the night of the election. We have included
a brief outline of Sue Wilson's qualifications as the only nominee
to date.
As a reminder, please remember that your Rules and Regulations require
that there be at least 33-1/3% of the Owners represented (in person
or by Proxy) at the meeting in order to hold this meeting so please
attend if at all possible. As further outlined by your Rules and Regulations,
any Owner's account that is over 30 days past due will not be permitted
to vote nor are they permitted to hold office as a Director, so we
encourage everyone to please bring any such accounts current prior
to the meeting night.
The actual meeting will last for two (2) hours, 6:30 p.m. to 8:30
p.m. The agenda (at this point) will include an overview of finances
including the 2010 budget that was adopted by the Board. In addition,
we will discuss and may vote on suggested changes/additions to existing
rules and regulations by Owners (see attached) and other issues such
as completion of the walkway/stair renovations and additional of security
cameras.
Once again, we are asking Owners to please, please, make every effort
to attend the Annual Owner's meeting as your Board and Management
need your input and support to continue improving Pier 8 and moving
forward.
We look forward to seeing as many Owners as possible and thank you
in advance for your attendance and support in the weeks and months
ahead.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
******************************************************************************************
****** PRELIMINARY ANNUAL
MEETING NOTICE ******
Annual Owner's Meeting & Election , Tuesday,
February 23, 2010, 6:30 p.m. to 8:30 p.m.
(e-mailed and posted: on web morning of January 19, 2010)
Please accept this as your preliminary notice that the Annual Owner's
Meeting & Election will be held at the New Orleans Yacht Club
at 403 N. Roadway, New Orleans, Louisiana on Tuesday, February 23,
2010; doors will open at 6:00 p.m. and the meeting will begin
at 6:30 p.m. sharp. A formal notice with complete information (including
a copy of the 2010 Budget) will be mailed to each Owner within the
next week or so but we wanted to get this preliminary notice out in
an effort to allow Owner's as much time as possible to plan well in
advance to attend the meeting if at all possible. In addition to this
e-mailed notice, a copy of the formal meeting notice will be available
on the Pier 8 Condominium website at www.pier8condos.com via the Bulletin
Board link on the home page.
Due to a Director's resignation in 2009, we will be holding an election
for that Director's position for the remaining two (2) year term of
the position. In 2009, your Board appointed Susan "Sue"
Wilson (Unit 212) as the interim Director and Sue will be running
for the permanent position at the meeting. If you wish to nominate
someone prior to the meeting, simply complete the Proxy/Nomination
form available on the Bulletin Board page of the Pier 8 Website and
e-mail (info@pier8condos.com) or fax it (504-889-1300) to our office.
Again, these efforts are aimed at generating as much Owner participation
as possible.
As a reminder, please remember that your Rules and Regulations require
that there be at least 33-1/3% of the Owners represented (in person
or by Proxy) at the meeting in order to hold this meeting. With that
in mind, it is again imperative that as many Owners as possible attend
this meeting. As further outlined by your Rules and Regulations, any
Owner's account that is over 30 days past due will not be permitted
to vote nor are they permitted to hold office as a Director, so we
encourage everyone to please bring any such accounts current prior
to the meeting night.
We look forward to seeing as many Owners as possible and thank you
in advance for your support in the weeks and months ahead as we continue
to improve Pier 8.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group
Date: Janaury 6, 2010
Subject: PEST CONTROL SERVICE - Saturday Janaury 23, 2010
On Saturday, January 23, 2010, Caballero Pest Control will be on
the property to provide the quarterly pest control treatment. They
will once again attempt to visit and treat all 77 Units however someone
(an Owner, their tenant, their neighbor or other representative) must
be present during those hours for this effort to be successful.
This time, Mr. Caballero will start on the ground floor and work
his way up so, those on the first floor should expect him from 10:00
to 10:45 or so and the third floor should probably expect him to start
there sometime later, say 12:00 to 12:15 or so.
As usual, Mr. Caballerio will be providing us with a list of those
Units that are actually treated that day. This will of course also
inform us as to which Units were NOT able to be treated due to lack
of anyone being present and providing access into the Units. Please
make arranges to have the Unit accessible for treatment. We will also
post this notice in the bulletin board across from the mailboxes and
in each elevator. In addition, a copy of this notice has been placed
on the Pier 8 website Bulletin Board for future reference.
Thanks in advance for your assistance regarding this matter.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group
Date: Janaury 5, 2010
Subject: Pet waste issue inside gated areas
We continue to experience a problem concerning pet Owners walking
their dogs inside the gated Pier 8 area common areas. Specifically,
Owner's are not picking-up after their pets. As everyone knows, pets
are to be walked outside of the gated area to avoid this problem.
Regardless, if an accident" should occur within the gated area,
pet owners are to pick-up after their pets. The grassy areas on the
entrance gate side of the property have been the major areas of concern.
We are asking for everyone's help to resolve this issue once and
for all as it is being created by one or two pet owners who simply
don't appear to care about maintaining a clean environment for all
to enjoy. Please call or e-mail me of any such violations that you
may witness. All we need is an approximate date and time, pet owners
name or Unit number and we will use the security cameras to verify
the violation and we can then follow-up by the applicable fine to
the offending pet owner. Please keep your eyes open for this violation
so that we can address the matter once and for all.
Thanks in advance for your assistance regarding this matter.Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group
Date: November 9, 2009
Subject: Gas to barbeque Pits left on
- Saturday 11.7.09
Please be advised that we received a report of the gas being left
on at two of the barbeque pits in the pool area this past Saturday
night. Once finished using the pits, please ensure that you turn the
gas off to avoid high gas bills to the Association and an unsafe condition.
Thank you in advance for your assistance and cooperation regarding
this matter.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
***************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group
Date: November 5, 2009
Subject: IMPORTANT NOTICE
- Roof Electrical disconnect project - Saturday 11.7.09 - third attempt
As you know, Charlie's A/C has been out at Pier 8 the past two Saturdays
attempting to replace all of the rooftop a/c electrical disconnects
in need of replacement; about 54 of them. During these two visits,
they have managed to replace about 30 leaving another 24 yet to be
replaced. They were not able to replace the remaining disconnects
because no one has been available to provide needed access into the
Units themselves. Through a process of elimination, they have been
able to identify which electrical disconnects still in need of replacement
belong to the following Units:
103, 104, 105,107,115, 116, 117,
201, 203, 204, 210, 214, 215, 216, 222
304, 310, 311, 312, 316, 317, 318, 319, 322
Charlie's A/C has agreed to return one more time in an effort to
complete the job without additional cost to the individual Owners
of these Units. With that in mind, Charlie's A/C will return to Pier
8 this Saturday, November 7th at approx. 8:30 am to attempt to complete
the job. IMPORTANT - ANY DISCONNECTS THAT ARE IN NEED OF REPLACEMENT
AND THAT ARE NOT ABLE TO BE REPLACED DURING THIS FINAL VISIT, WILL
HAVE TO BE REPLACED INDIVIDUALLY AT AN ADDITIONAL $50.00 PER DISCONNECT
CHARGE TO THE UNIT OWNER; THIS IS THEIR CHARGE FOR HAVING TO MAKE
INDIVIDUAL TRIPS AFTER THIS WEEKEND.
This is not optional. There is a safety issue involved here and these
disconnects must be changed or we risk negatively impacting the Association
Insurance.
Thanks you in advance for cooperation in getting this issue resolved
and behind us.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
******************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group
Date: October 30, 2009
Subject: IMPORTANT NOTICE
- RoofElectrical disconenct project Saturday October 31, 2009
As you know, we have Charlie's A/C scheduled to be on the property
this Saturday morning to complete installation of needed rooftop electrical
disconnects for the South (rear) and West (exit gate side) buildings.
At the time of this e-mail, it appears that we may have serve (rainy)
weather in the area Friday night and Saturday. With that in mind,
please be advised that if it is raining Saturday morning or looks
like it is going to be raining on and off during the morning, Charlie's
A/C will not be able to work on the electrical roof project and it
will be rescheduled; we will provide a new date and time after Saturday
if needed. We will send out one more update regarding this issue later
today as we learn more about what the weather is going to do so please
check your e-mail and/or the Pier 8 website bulletin board this evening.
Thank you in advance for your patience and understanding while we
attempt to complete this project.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group
Date: October 15, 2009
Subject: Security System and review of associated recordings
In recent weeks, many of you may have seen numerous e-mails concerning
the viewing of security tapes by Owners. In an effort to "clear-up"
any misinformation concerning this matter, we offer the following
general overview of how security systems and recordings are generally
handled in the industry.
First, one of the most important aspects of any security system is
that the general public not be aware of what can and cannot be seen
by a system for obvious reasons. Generally speaking, Management and
the Board are usually the only ones that have access to review recordings
when an incident/request warrants.
If while reviewing recordings a note worthy incident/crime is witnessed,
then certainly copies of the incident/crime would be made. If a police
report has been filed, then a CD copy of the particular incident/crime
would be provided to the police for their use. IMPORTANT -
We do not release copies of surveillance recordings when there is
nothing to be seen; this practice is basically privacy and security
reasons as explained above. To begin releasing meaningless recordings
would result in eventually revealing what can and cannot be seen by
the system cameras thus aiding in a potential "defeating"
of the system's overall purpose.
Contrary to recent comments by an Owner or two, Management (nor your
Board) has anything to hide when it comes to the reviewing/release
of security recordings; it's simply not a good practice to share this
information when nothing of significance appears on the recording(s)
in question. The general requirement of a police report is aimed at
preventing useless time and effort being expended on incidents that
are apparently not worthy of a police report. In other words, time
an effort is not normally spent reviewing tapes when no crime has
been commented Generally speaking, security recordings were not intended
as a means of "refereeing" personal incidents between individuals
but rather to aid in an investigation when a crime or suspicious active
has occurred in or around a property.
Trusting this meets with the approval of majority Owners, should anyone
desire additional information, please feel free to call at your earliest
convenience.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management & Board of Directors
Date: October 7, 2009
Subject: Fire alarm inspection, A/C rooftop disconnect repairs
& Lake Marina Drive traffic issue
Annual Fire Alarm System Inspection - On Wednesday, October
14, 2009, the Pier 8 fire alarm system will undergo the required annual
inspection. During this inspection, I.T.S. will also attempt to locate
apparent "shorts" within two conduit circuits that are believe
to be the cause of recent false alarms during or shortly after heavy
rains. This should resolve this issue.
We have also realized that this system has never been monitored;
in other words, when the system "sounds" no one is called
or alerted to the fact that Pier 8 has a potential fie except those
on the property at the time of the alarm. In our opinion, this is
totally unacceptable and we have recommended monitoring of the system
to increase the overall safety of Pier 8 occupants. With that in mind,
we have requested a proposal from I.T.S. to have the system monitored
and will be for presenting it to your Board for its consideration.
We will provide an update on this issue in the weeks ahead.
Lake Marina Drive Work/Traffic issue - We have been recently
contacted by Tetra Tech, the Corps of Engineers' prime contractor
on the floodwall/floodgate replacement project at West End, to help
them inform local residents, businesses and lakefront users about
traffic changes that will happen when the construction on that project
begins. In brief, they will be replacing the entire existing flood
wall from the 17th St. canal eastward along Lake Marina Dr. Work is
scheduled to begin during the latter part of October and the project
is scheduled to go continue for 6-9 months, during that time lane
restrictions along Lake Marina Dr. will be implemented as the project
progresses. We will advise you of any further details as they become
known to us.
Pest Control Service - On Saturday, October 24, Caballero
Pest Control will be on the property to provide the quarterly pest
control treatment. They will once again attempt to visit and treat
all 77 Units however someone (an Owner, their tenant, their neighbor
or other representative) must be present during those hours for this
effort to be successful. This time, Mr. Caballero will start on the
third floor and work his way down so, those on the third floor should
expect him from 10:00 to 10:45 or so and the first floor should probably
expect him to start there sometime later, say 12:00 to 12:15 or so.
As usual, Mr. Caballerio will be providing us with a list of those
Units that are actually treated that day. This will of course also
inform us as to which Units were NOT able to be treated due to lack
of anyone being present and providing access into the Units. Please
make arranges to have the Unit accessible for treatment. We will also
post this notice in the bulletin board across from the mailboxes and
in each elevator. In addition, a copy of this notice has been placed
on the Pier 8 website Bulletin Board for future reference.
Rooftop A/C disconnects replacements - As many of you know
from our past Owner meetings, we have had an issue concerning rooftop
A/C disconnects. Specifically, approximately 54 disconnects are in
need of replacement as they pose a potential hazard that pose a life
safety issue in addition to potentially affecting our insurance coverage
if not addressed. With this in mind, we have scheduled the replacement
of those disconnects for Saturday, October 24 and Saturday, October
31; this will be full day affairs. We will attempt to complete replacements
of the front (North) and East buildings on October 24 followed by
the replacement of the South and West building disconnects on October
31, 2009. Owners will need to be present as none of these disconnects
are identified as to what Unit they serve. The work will be completed
by Charlie's A/C which has done work for many Pier 8 Owners in recent
months. The cost of replacing each disconnect is $87.00. Given that
this is an Owner related responsibility, we will be identifying each
disconnect (relative to what Unit it serves) and will be forwarding
an invoice to those Owners affected for the replacement. During the
process, Charlie's A/C will need access to those effected Units to
turn A/C's off and on in order to make the needed identification.
It is imperative that someone be available to open your Unit on these
dates in order for us to accomplish this task; there is simply no
other way to know which disconnect serves what Unit. If you feel that
you would like to have your rooftop disconnect replaced/repaired on
your own prior to the scheduled work dates, please feel free to do
so prior to those dates and advise us upon completion; obviously,
there would then be no need for you to be present on either of these
dates.
Thank you in advance for your assistance and cooperation regarding
these matters. Should you have any questions or require additional
information, please feel free to call or drop us an e-mail at your
earliest convenience.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
******* NOTICE
*******
Fire Alarm System Inspection/Test
Wednesday, October 14, 2009
Please be advised that we have scheduled the annual inspection/testing
of the fire alarm system for this Wednesday morning, October 14, 2009.
The Inspection will begin at about 7:00 a.m. however no alarms will
be sounded until 9:00 a.m. so as not to disturb anyone.
Thanks in advance for your patience and understanding during this
mandatory inspection/test.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management & Board of Directors
Date: September 1, 2009
Subject: Notice of increase in monthly condo fees - Effective
October 1, 2009
As many of you know, we are now completing the remaining exterior
punch-list items. Based on repeated comments by Owners over the past
several weeks, most appear very satisfied with the final results.
The project is expected to be completed later this week at a total
cost of just under $197,000.00 (including coordination fee) or about
10% higher than the original estimate for the project prior to knowing
exact variables such potential unseen termite or water intrusion damage.
In the end, the job "came in" as expected, just under $200,000.00
and we now have an exterior that should provide an extended life of
10 to 15 years.
With this major capital improvement behind us, we turn our attention
to other Owner desired capital improvements including renovations
to the stairs and walkways, front landscaping and lighting, painting
of fences and covered parking structures as well as enhanced security
system coverage, etc. At the same time, we must also acknowledge continuing
increases involved with routine services.
While increases are never a welcome issue, increases are an inherit
reality. Admittedly, nothing ever seems to go down. The most recent
example is the Association's annual Property, Wind & Hail coverage.
As outlined in the June 10, 2009 insurance renewal notice to all,
an increase of nearly 10% was/is going to needed just to cover the
recent increase in insurance costs alone. In addition, sound fiscal
planning dictates that we make allowances for other desired capital
improvement as well as the eventual building of acceptable reserve
levels.
With this in mind and faced with this unpleasant task, your Board
has been considering these issues since early June. The Board of Directors
met on the evening of August 31, 2009 and, after weeks of deliberation
regarding this matter, voted unanimously to increase current monthly
condo fees by the permitted 15% effective October 1, 2009. We are
attaching a condo fee schedule of current monthly condo fees and the
new resulting monthly condo fees (rounded to the nearest whole dollar)
that will take effect October 1, 2009.
Again, none of us cherish the thought of increases; unfortunately,
it's simply a reality that none of us can escape. Rest assured that
your Board of Directors and Management Company will consider any and
all cost saving measure while continuing to provide the highest level
of services and improving the physical property in hopes of continuing
to enhance what is more than likely one of you biggest investments.
Should you have any questions or require additional information, please
feel free to call or drop us an e-mail at your earliest convenience.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
Pier 8 Condo Fee Schedule - Effective
October 1, 2009
Current -----------------Dues Dues as of Oct. 1, 2009
$153.00 --------------- $176.00
$160.00 --------------- $184.00
$167.00 --------------- $192.00
$176.00 --------------- $202.00
$182.00 --------------- $209.00
$187.00 --------------- $215.00
$188.00 --------------- $216.00
$194.00 --------------- $223.00
$198.00 --------------- $228.00
$201.00 --------------- $231.00
$202.00 --------------- $232.00
$205.00 --------------- $236.00
$209.00 --------------- $240.00
$214.00 --------------- $246.00
$215.00 --------------- $247.00
$221.00 --------------- $254.00
$222.00 --------------- $255.00
$242.00 --------------- $278.00
$244.00 --------------- $281.00
$287.00 --------------- $330.00
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: August 7, 2009
Subject: Friends of West End Meeting - Tuesday, September 15,2
009
The Board asked that I provide the following notice to Owner's regarding
an upcoming event involving the "Friends of West End" organization
in case anyone wish to attend:
The Friends of West End is planning to have a public meeting on September
15th:
West End Park Master Plan Public Meeting
Sponsored By: Friends of West End, Inc. and the New Orleans Municipal
Yacht Harbor Management Corporation
Tuesday, September 15, 2009
Refreshments at 6:00, Meeting 6:30 to 8:30 PM, St. Paul's Episcopal
Church, 6249 Canal Blvd.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: July 24, 2009
Subject: Final Painting of Doors - Saturday
Good afternoon Pier 8 Owners:
Just a quick reminder that Base Contractors will be out tomorrow
morning (Saturday) to finish applying the second coat to the. As many
of you know, Base was able to get a second coat on many of the doors
last weekend so they should be able to be finished the remaining doors
by noon if not sooner.
On a side note, Cox cable will be "cleaning up" various
cables on the building next week. There are several cables that have
been run across the roof and we have advised Cox that these must be
removed. With that in mind, some Owner's will more than likely be
contacted by Cox to advise of interruption in service while they route
the cables properly. Based on our meeting with them earlier this week,
they should be able to complete the entire "clean-up" over
the course of two to three days. Once they finish, Base has agreed
to do any touching up of areas in need of attention prior to completing
their work.
Have a great Weekend!
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
******************************************************************************************
******* NOTICE *******
(NOTICE IS ALSO POSTED ON WEBSITE BULLETIN BOARD)
Pest Control
Service Scheduled - Saturday July 18, 2009
Starting at 10:00 a.m. to 1:00 p.m.
Mr. John Caballero's, of Caballero Pest Control, will be on the property
Saturday morning, July 18, 2009 from approx. 10:00 a.m. till 1:00
p.m.. They will once again attempt to visit and treat all 77 Units
however someone (an Owner, their tenant, their neighbor or other representative)
must be present during those hours for this effort to be successful.
This time, Mr. Caballero will start on the ground floor and work his
way up so, those on the first floor should expect him from 10:00 to
10:45 or so and the third floor should probably expect him to start
there sometime later, say 12:00 to 12:15 or so. As usual, Mr. Caballerio
will be providing us with a list of those Units that are actually
treated that day. This will of course also inform us as to which Units
were NOT able to be treated due to lack of anyone being present and
providing access into the Units. Please make arranges to have the
Unit accessible for treatment.
VERY IMPORTANT - If no one is at the Unit to allow access and a Unit
misses two (2) consecutive scheduled treatment dates, the Association
will demand that the Unit Owner have the Unit treated (at the sole
expense of the Owner) and that they provide the management office
with a copy of the invoice evidencing that treatment. The reason for
this is simple; if we don't routinely treat ALL Units then our efforts
will be ineffective as treatment of ALL Units is the only way to provide
an effective pest control program. We will also post this notice at
the bulletin board near the mailboxes and in each elevator as a reminder.
****** NOTICE ******
(NOTICE IS ALSO POSTED ON WEBSITE BULLETIN BOARD)
Unit Entry Doors - Painting Scheduled
Saturday, July 18, 2009
Unit entry doors are scheduled to be painted over a two weekend period.
We are scheduled to apply the initial coat to ALL doors beginning
8:00 a.m., Saturday, July 18th; we will start on first floor and work
as quickly as possible to finish the initial coat hopefully by around
4:00 p.m. We will then return the following Saturday, July 25th at
8:00 a.m. to apply the second coat to all doors. In fairness, we will
begin on the third floor that Saturday morning and continue downward
until finishing all doors again around 4:00 p.m. We understand that
is a bit of an inconvenience but we are going to need your assistance
by allowing the doors to dry in a slightly open position for about
4 hours following each coat; there simply is no other way to paint
a door correctly unless you allow it to remain at least partially
open during the drying process. With this in mind, please make arrangement
to have someone present during these dates and times so that we can
complete what is probably the task as quickly as possible.
Thank you in advance for your assistance and cooperation during the
final weeks of this long awaited exterior Pier 8 renovation.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: June 23, 2009
Subject: Door color changed to Ivory
As many of you know, our office received a petition signed by a total
of 38 Owners last Wednesday requesting that the door color be changed
from dark brown to Ivory, the same color as the railing. The petition
was forward to the Board for consideration.
While the petition does not admittedly constitute a majority of Owners,
the Board felt that the petition represented a significant number
of Owners thus warranting the Board's "re-visiting" of the
door color issue. Yesterday, Monday, 22, 2009, I received an e-mail
from the Board that the door color is to be changed to Ivory. With
that decision, the matter is considered resolved allowing us to move
forward with this portion of the exterior renovation project at Pier
8.
In light of the decision, Base Contractors has been notified of the
change and we are waiting on word from them as to what day they will
begin painting the doors. We hope to know by the end of today and
will advise everyone accordingly via mail-out to all Owners, mass
e-mail, posting around the property and a posting on the Pier 8 website.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: June 19, 2009
Subject: Link to recent petition - opposing Owners - Paint
issue
In an effort to reduce the potetnail for teh spreading of more mis-infoprmation
relative to what the petition says, who it was signed by or what it
contained, we are providing all with the link below to the complete
document/package that was received in our office at approx. 1:30 p.m.on
Wednesday ,June 17, 2009.
Submitted Petition Package in it's entiry
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: June 18, 2009
Subject: Door color situation updateExterior Renovation
Well, as many of you know by now, the dark brown door color continues
to be an issue at Pier 8. Yesterday, I received a petition (actually
two petitions) in our office at about 1:30 p.m. delivered by Sheryl
Wagers; I will publish the delivery in its entirety on the website
in hopes of avoiding yet another bad rumor or spreading of misinformation
by the "rumor mill".
The two petitions have two different headings; one says"
..opposed
to the color and the color selection process" and the other says
"
.request for their doors to be painted ivory". I
have forwarded the entire delivery to the Board and counsel via e-mail
yesterday at about 2:45 p.m.
I asked Sheryl Wagers (via a follow-up e-mail yesterday at 5:53 p.m.,
copy on file) as the property manager, no one from the Board or counsel
has asked this, that in an effort to resolve the matter for both sides
here, if the 38 people were saying that if the door color was changed
from the current dark brown to the ivory (the current rail color I
presume), if this would resolve the matter? Does that sound familiar
to anyone? That was my e-mail of June 1 to everyone. If that was the
case, I want to (as previously offered in the June 1 e-mail to everyone
in the database) present that to the Board as a way of perhaps resolving
this quickly before the doors get painted dark brown this Saturday
morning. If that was not the case, then I would simply await further
instruction from the Board regarding the e-mailed petitions yesterday
to them. The Board is awaiting that additional input from the group.
As of this e-mail, I do not have a response from Sheryl but she did
say (earlier today during a phone conversation with her) that she
would check her e-mails and get back to me.
In the e-mail to her, I explained that if she was unable to speak
for the group, I of course would understand but to simply advise accordingly.
Again, I (and the Board) am trying to help the 38 Owners just as we
did by sending out the mass e-mail to Owner's on June 1 asking people
to respond to this changing of doors to ivory issue; that's when I
received the previously mentioned 5 or 6 additional responses. That
e-mail back then (before this petition) was aimed at seeing if changing
the color back then to ivory (the railing color) would resolve this
issue; unfortunately the additional 5 - 6 responding Owners brought
the then recorded total opposition to about 22 people as outlined
by the printout I made for and gave to Sheryl yesterday while in my
office. I would like everyone to know (as Sheryl now knows) that we
have in indeed been keeping track of those responding in opposition
all along the way, despite what a few others would have you believe.
The printout speaks for itself; don't take my word for it, ask Sheryl;
I offered it and she watched me print it out of my computer within
moments of the offer.
Ok so now what? Well, I've met with the contractor today and here's
where they are on the issue. While they will be working this Saturday
at Pier 8, they will not, repeat, will NOT be painting any doors and
color and subjecting their workers to any further hostilities at Pier
8 by a few Owners who insist on acting extremely immature. In fact,
the contractor will not proceed with the painting of any doors until
further written direction is received from our office.
The contractor has advised that if they have not receive final direction
from our office by July 13, 2009 specifically advising them of what
color they are to paint the doors once and for all, they expect to
begin "demobilize", shortly thereafter and will simply subtract
whatever the cost of painting the doors they have in their proposal
(less the 12 gallons of dark door paint they have already purchased)
and will complete the remainder of the project leaving the doors unpainted.
If, after exiting the job site they are called back to complete the
painting of the door (with whatever color), they will be happy to
do so; however, all should be aware that the cost will be adjusted
for the additional mobilization of their crew back on to the job.
Actually, I think that's a great solution to the current situation.
That will give everyone all the time we need to figure out what all
77 Owners would like the door color to be. Of course, I'm sure everyone
will agree that we will never get all 77 Owners to agree on any single
door color.
For now, we will simply provide everyone with any noteworthy developments
as we become aware of them.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: June 11, 2009
Subject: Friends of Westend
A new group, "Friends of Westend", have asked that we notify
interested homeowners in the area the formation of the new group call
formed to assist with the beautification and maintenance of the park
located near the Yacht Club. The Board is seeking any volunteers to
represent Pier 8 in this effort. Please advise if you would be interested
in participating. We encourage you to visit the website as outlined
below:
Friends of West End Board of Directors,
www.FriendsOfWestEnd.org<http://www.FriendsOfWestEnd.org> is
up and running.
Our webmaster David Herrera has given us a starting point. It would
be most helpful and appreciated if you all would comment and make
suggestions concerning all aspects of the website.
Please also comment and make suggestions concerning the Friends of
West End Facebook Page. 1,161 Fans and growing.
Please email comment and suggestions to
SMurray@MurrayYachtSales.com<mailto:SMurray@MurrayYachtSales.com>
Thank you,
Stanton Murray
Office (504) 210.3668
Cell (504) 319-7376
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: June 10, 2009
Subject: Insurance Renewed - 5% Wind & Hail deductible
obtained
As many of you know, the Pier 8 insurance policy expired on June
10, 2009. The Board and Management have been working diligently over
the past several weeks to ensure that yet another inherited problem
was resolved; that of the 10% Wind and Hail deductible that has begun
to create problems for "would-be" buyer and sellers alike,
not to mention long term Owners such as yourself. Image, we are hit
by another hurricane and we are faced for a $550,000,00 deductible
based on a 10% policy! We are pleased to announce the implementation
of a new insurance policy, effective (June 10, 2009) that reduces
our deductible exposure to 5% while taking our expiration date out
of the beginning of hurricane season! Image trying to negotiate a
renewal (or new policy) in the middle of hurricane season. Why would
we ever allow that to continue to work against us! Now for the details.
First, everyone knows that we could not truly handle a 10-% deductible;
we simply don't have the resources for that and lenders are beginning
to catch on. So, we had to seek out a lower deductible that Lenders
would accept thereby enabling us to return to selling (if that's what
you want) these Units without the fear of being rejected simply because
we had a high (10%) wind and hail deductible. State Farm was proposing
an increase to nearly $40,000.00 for the same 10% deductible provided
during the past year. With that in mind, we shopped utilizing the
services of five (5) different brokerage firms who solicited over
15 different carriers for a policy offering reduced deductible. The
end result was we singed a new 5% policy at about $44,000.00; that's
correct about $4,000.00 more (annually) than the proposed renewal
from the State Farm policy but with about a $250,000.00 less deductible.
If all Units paid the same monthly fees, that translates into about
$3,5000.00 per Unit saving should we be hit with a hurricane and faced
with the deductible or special assessment to cover the 10% deductible.
Does this solve all our worries, of course not, but it's certainly
a step in the right direction. Next year, we'll be looking for a 3%
deductible.
Now, the issue of expiration. Why would anyone want to go to a negotiating
table for the renewal of an insurance (Hurricane) policy in the middle
of hurricane season? Once of the things we have done at all properties
that we manage is get the renewal period out of the hurricane season;
that'' common sense isn't it. What we did was implemented the new
policy through April 1, 2010. This does two things. First, we are
no longer going the table with our hat in our hands asking for a renewal
in the beginning of Hurricane season. Think about it. What would your
quote (if you were the insurance company) be if a storm was in the
Atlantic and showing all signs of coming into the Gulf at the time
your were trying to renew or obtain a new policy? Would you write
a new policy? If you did, what would you quote? Secondly, we know
that the revised insurance pricing usually comes out sometime shortly
after the first of the year. Granted, that could work against you
but in recent years, the rates and coverage have been getting better
each year. What better time to renew (for now) than right after the
time when we know the best rate and coverage's are being "re-thought"
and offered?
Ok, now the big question, does this mean an increase in monthly dues?
Let's face it, nothing is going down. Last years coverage with State
Farms 10% deductible policy cost the Association about $28,000.00;
their renewal offer was just under $40,000.00. The policy we opted
for with the reduced 5% deductible was right at $44,000.00. While
I think your current budget can absorb some of that increase, ultimately
I have to admit that there is going to need to be an increase of some
sort in the near future if these services are to continue to be provided.
A fiscally responsible Association will have an annual increase (say
6-10 %) just for inflation alone. Not to increase your condo fees
on an annual basis by some amount will only result in an exaggerated
amount somewhere in the future; 20, 25 or even 30% as we have seen
at Associations who simply held their fees for several years with
no increase at all. Personally, I'd rather see small annual increase
than receive a 30% increase all in one year. At any rate, an increase
in the next few months is not necessarily need but I will be strongly
recommending to the Board that they begin to study that issue as increases
are unavoidable; nothing ever seem to go down, at least not in my
world.
Well that's it for now. We wanted to make sure everyone was aware
that a new and better insurance policy is in place. We also wanted
to get ahead of the rumor mill and provided you with
..
the
rest of the story. Have a nice evening.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group, Property Management
Date: June 6, 2009
Subject: Exterior Renovation
With majority of the needed wood replacement out of the way, the
exterior renovation project continues to progress on schedule. While
we did find active termites in areas where the exterior wall was allowing
water into the structure, termite activity has been less than we had
expected.
Given expressed concerns about the color scheme by a group of Owners,
we sent out an e-mail last week to Owners asking their opinion on
the door color; we received six responses to that e-mail. Based on
the response, there simply does not appear to be anything near a majority
of Owners that oppose the current color scheme. The Board met on Tuesday
night and revisited the issue of door color as well. Based on their
review,discussion and facts, we are proceeding with the current color
scheme and believe that the vast majority of Owners will be very pleased
with the overall outcome of the long awaited exterior renovation.
The new metal roof panels have also been installed at the tops of
the stairs. Unlike the previous ones that had apparently been painted
and were peeling, the color on the new panels was factory applied
and should last for years to come.
A section of the brown canopy (and aluminum structure) at the front
of Pier 8 will be removed on Tuesday by the original installer, Foster
Awning, so that the contractor can properly access the adjacent walls
leading up to the entrance gate. Once the needed repairs are completed
and the walls are painted, the brown awning will be reinstalled.
With the cooperation of weather and baring any unforeseen new issues
relative to the remaining walls to be addressed, we are hoping to
wrap this project up by the end of June or first part of July.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: June 1, 2009
Subject: Exterior Renovation / Suggestion to Owners, Board
and Paint Committee
Over the past couple of weeks, I have discussed (via phone, in person
or by e-mail) the current paint selections. While all appear to be
very pleased with the job Base Contractors is doing, as of this date,
I have received fifteen (15) notices (fax, e-mail, etc.) from different
Owners expressing their dissatisfaction with paint scheme; most have
"zeroed in" on the dark brown door color. Most have also
stated that they could live with the building and rail colors.
With that in mind, I began speaking with a few of those Owners over
the past few working days concerning what they would think of changing
the dark brown door color to the lighter railing color; without exception,
their response was that they felt that could/would resolve the issue
at hand. If that is true, we would then have two colors:
Main building - SW6109 - Hopsack
Doors & rails - SW6106 - Kilim Beige
In an effort to hear from those 15 Owners that have expressed dissatisfaction
with the current color scheme, (and anyone else that wishes to express
their opinion on this type of change), I would like to hear if this
would resolve the issue for at least the 15 Owners. If I can get some
quick feedback, I would recommend to the Board and paint committee
that this change be implemented before we get any further along with
the painting of the property. With that in mind, I am sending this
to the 50+ Owners in our database and would appreciate everyone's
earliest response (via e-mail please) in hopes of resolving the issue
without further delay or potential for legal expenses to the Association
and/or individuals currently opposing the color.
I await your assistance in resolving the matter for the good of the
whole.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: May 23, 2009
Subject: Exterior Renovation/Color Update
Thus far, the exterior renovation has been progressing pretty much
as expected. To date, while we have found evidence of some water intrusion
through the horizontal joint that was created following Katrina, no
termite activity has been found along the joint. Active termites were
found on the south elevation of the east building adjacent the pool.
The termites were apparently getting the needed moisture from around
the exterior window framing that was obviously leaking; the siding
was removed, the affected areas treated, the plywood replaced where
needed and new exterior siding installed. This wall was one of the
four (4) that had been included in the initial pricing as needing
to be totally replaced so the only additional expense will be for
the underlying minimal plywood that needed to be replaced. The south
wall of the west building adjacent the pool area has also been replaced;
no active termites were found during that replacement.
Active termites were also found on the north elevation of the north
(front) building over the sliding glass door area of Unit 301; that
area was opened up, effected plywood removed, the area was treated
and new plywood and siding was installed. Based on what we found in
this area, we are expecting similar situations over most of the sliding
glass door areas across the third level on the north building. Updates
will be provided as the job progresses across the front of the north
building. It should be pointed out that all termite activity to date
have appeared to be very localized and did not appear to extend to
the ground. In other words, the termites were concentrated in localized
area where water intrusion was occurring through the exterior siding
so there was no need for them to travel back to the ground (and thus
through the structure leading to the ground) for the moisture that
termites need to survive.
Regarding rumors surrounding the recent stop work order. After investigation,
the issue centers on a cleaning of the rooftop of the adjacent building
and had nothing to do with working being performed at Pier 8. Apparently,
there were a few cars parked in the exterior parking area adjacent
the entrance gate this past Wednesday. While the adjacent building
rooftop cleaning was occurring, they washed over the edge of the building
and the wind blew wash and dirty onto some of those cars. As we understand
it, one of those cars belonged to a relative of a city inspector.
Believing the incident involved the Pier 8 contractor, he posted the
stop work stickers. Once he was advised that our contractor had nothing
to do with the incident and in fact learned that it was the result
of an operation at the adjacent property, he agreed that work at Pier
8 could resume. Despite the usual out of control rumors and e-mails
by a few Pier 8 Owners, that's all there was to it, nothing more and
work resumed Friday morning.
Regarding the paint selection issue. As many of you know, we have
had a hand full, 6-8 Owners, voice objection to the paint selection
recommended by the paint committee and confirmed by your current Board.
Following the initial paint "mock-up" area in front of Unit
323, the paint committee felt that the dark brown door color was to
dark and revised their recommendation to a slightly lighter brown
shade. They also felt, based on input from a few other Owners that
the main building color was to greenish/gold, so they also revised
that color to more of a true tan shade. Those colors were applied
to half of the initial mock-up area and have now been confirmed as
the colors to be used. The final Sherwin William colors are:
Main building - SW6109 - Hopsack
Door color - SW6104 - Kaffee
Rail color - SW6106 - Kilim Beige
Again we all know that there would be no way that we could ever get
77 different people on the same page relative to color selection and
that is understandable. Our goal here is simple; please the majority.
The Board was elected by Owner's and paint colors were selected and
recommended by the previously established paint committee made up
of then Owners not Board Members. The new Board Members have approved
the recommend colors unanimously and we are now proceeding with those
colors. Personally, I truly believe the current selections will appeal
to an overwhelming major of Owners once the job is completed. Having
said that, as your manager, I welcome a fax or e-mail from any Owner
who wishes to express concern over the current selection and you have
my commitment to forwarding those responses to the Board. If we receive
anything that remotely resembles a majority of Owners, then perhaps
there is an issue. Conversely, if we receive an obvious minority of
concerns, then I can only presume that there really isn't any major
objection to the current selections.
In the end, I also believe that an over whelming majority of Owners
will be please with the fact that a long await exterior renovation
has been completed and Pier 8 will once again be looked on as a premiere
location on along the Lakefront area.
From all of us at ALCOR and your Board of Directors, have a happy
and safe Memorial Day celebration.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: May 4, 2009
Subject: Exterior Color Update
Following the posting of the renderings provided to me at the recent
Special Owner's meeting, I received a few e-mails expressing concern
regarding colors for the renovation. Based on those e-mails, there
was obviously some apparent confusion, at least on my part, concerning
previously presented/recommended paint schemes. I obtained the actual
color samples from the paint committee last week and immediately realized
that the main building color on the posted renderings was not representative
of the actual samples provided last week. In an effort to avoid any
further confusion and prior to proceeding with any paint "mockup"
or purchase, a meeting of the Board was called with the pervious paint
committee members present; that meeting occurred last night at Pier
8.
After a review of the facts and e-mails leading up to the meeting
by all present, the actual two paint schemes samples where once again
presented for all to view. Discussion followed and a recommendation
was made to add a third color to one of the schemes to be used on
the handrails; here are the color schemes that were reviewed:
Scheme A: Main building color HC-20 Woodstock Tan, Door color HC-67
Clinton Brown & Rail color HC-79 Greenbrier Beige
Scheme B: Main Building color 2131-40 Smokestack Gray, Door color,
2126-20 Raccoon Fur
The colors outlined above can be seen at www.myperfectcolor.com.
Simply input the color number into the space provided in the upper
right hand corner of the page. While colors on computers vary a bit
from actual samples, actual samples can be obtained from any Benjamin
Moore paint supplier for those wishing to confirm the actual colors.
I viewed all of these colors on-line and the only one that appeared
significantly different on my computer was HC-79 Greenbrier Beige;
it appeared a bit darker tan shade than the actual samples I have.
Other than that, all other colors appeared extremely close to the
actual color samples in my possession.
With exception of the added third color for railings, the paint committee
and the only remaining current Board member from last year that was
present at last year's meeting agreed that these were the colors they
had presented/viewed last year. With the same parties present in the
room at the same time agreeing that these were in fact the colors,
I believe all should now agree that this resolves the issue of what
was presented last year. It does in my mind, regardless of the few
e-mails that will surely follow this post from a few who simply refuse
to agree with the majority of Pier 8 Owners on several issues. Unfortunately,
that is the "nature of the beast" when it comes of Associations
in general; there are always a few that will disagree no matter what
the issue or decision is, not much can be done about that.
With that behind us, the Board voted to proceed with the mockup of
Scheme A and we will attempt to complete the mockup of the main building
color on the wall at the entrance gate and the complete scheme in
front of Unit 323. Once the mockup is completed, the Board and paint
committee members can view and hopefully confirm the colors that will
then allow us to proceed. If anyone wishes to voice their opinion
concerning the mockup, please do so by e-mail to me at al@alcorgroup.com
and I will in turn forward those on to the Board and paint committee.
Again we all know that there would be no way that we could ever get
77 different people on the same page relative to color selection and
that is understandable. Our goal here is simple; please the majority
of Owners by proceeding with colors viewed by most to be acceptable.
The Board was elected by Owner's and paint colors have once again
been confirmed from those actually presented by the then appointed
paint committee. We will now attempt to once again move this long
awaited exterior renovation forward.
We will keep you advised of the progress regarding this project in
the weeks ahead.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: April 24, 2009
Subject: Exterior Renovation Update
Since the recent Special Owner's Meeting, we have been working on
the details of starting the exterior renovation project. The AIA agreement
has been signed, crews have been established, an onsite staging area
for materials has been determined, materials have been ordered and
are headed this way and the contractor will have men on the job this
coming Monday, April 27 to get the actual work started.
We will begin by having the contractor complete a section of the
East wall at the entrance gate that will show all aspects of the job
to be completed; treatment of the horizontal joint that needs to be
repaired, the final cap over that joint, followed by priming and 2
coats of paint. The Board and Management will review the sample area,
make any needed adjustments and then release the contractor to proceed
on with the entire job.
Try as we may to stop the rumor mill at Pier 8 by a select few, as
many of you know, there has been rumors circulating concerning color
selection, so let's address that in hopes of shutting that down before
it gets out of control. The final colors have been confirmed by the
current Board. The selection was made from the same colors presented
back in May 2008 by the paint committee that was apparently appointed
to handle that aspect of the job back then. In brief, there were two
schemes that we saw; one was a very similar blue to that that currently
exists with black doors and railings and the other was a tan scheme
(main building color) with a light brown for the doors and rails.
In general, it was felt that the tan scheme was a more up to date
theme. While color is admittedly not my forte, personally I think
it the departure from the current bluish color will go a long way
towards evidencing the major renovation that we are about to undertake.
The surrounding community, agents and prospective buyers will have
no doubt that something new and positive is on the horizon for Pier
8 and its Owners. While I am still trying to confirm the paint numbers
that appear on the rendering prepared back in May 2008, we are working
to get the actual numbers in the Sherwin Williams Super Paint that
will be used, we wanted to provide everyone with at least a look at
the renderings themselves so that all have a general idea of what
the main color of the building is so that any rumors to the contrary
can be dispelled and we can continue moving forward with this project.
You can view these by clicking on the following links: Rendering
1, Rendering
2, Rendering
3.
We all know that there would be no way we could ever get 77 different
people on the same page relative to exterior color and that's understandable.
For that reason, the Board that was elected by Owner's made the decision
from the selection previously put together by the paint committee
and we can now move forward with the long awaited exterior renovation
that will truly give the general public the message that Pier 8 is
back!
We will keep you advised of the progress regarding this project in
the weeks ahead.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
**********************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: April 8, 2009
Subject: Owner Approval of Exterior Siding Renovation &
Painting
Congratulations Prier 8! Last night at the Special Owner's Meeting,
Owner's unanimously (without opposition) approved the long awaited
exterior siding renovation and painting of all buildings.
The meeting opened with an announcement of the newly Board appointed
At-Large Member, Ms. Sue Wilson. Sue will fill the position vacated
by Buzzy McFerrin and Sue will serve until the next Annual Owner's
meeting when the position will be subject to nominations and election
(by Owners) for the remaining original 3 year term. On behalf of the
Owners, the Board and Management, congratulations Sue and thanks for
the commitment of your personal time to Pier 8's future.
A brief overview of Pier 8 Financial condition was presented, including
a review of March 2009 Income and Expense statement.
A brief review of the past month's bid process was presented and
the floor was opened to Owners for a question and answer secession
that continued right up till about 8:30 p.m. With question and answers
completed, a motion was made and Owner's voted unanimously to proceed
with the exterior siding renovation and painting by Base Contractors.
Yet another Owner motion followed that we seek the cost of a "Performance
Bond" and that the Board decide whether or not the Bond should
be purchased; the motion also passed unanimously without opposition.
The price for a Bond will be provided within a day or two followed
by signing of the AIA 101 agreement and work will begin immediately
in hopes of completing the task in 90-120 days thereafter. With the
cooperation of weather, we are hoping that the project will be completed
sooner and plan to keep Owners abreast of the progress in the weeks
ahead. One last point of clarification on this issue; last night,
I inadvertently stated that ALCOR's fee for the handling of Capital
Improvement projects in excise of $100,000.00 at Pier 8 was 7% of
the total cost; this was an error on my part. ALCOR's fee for Capital
Improvements such as this one is in fact 5%, as clearly outlined by
our Management agreement. This fact was pointed out to me after our
meeting by other attending ALCOR management members. My apologies
for the error; it was a bit of a long night and an honest mistake
on my part; our agreement speaks for itself.
With that decision behind us, yet another major issue was placed
on the floor by an attending Owner, discussed and voted by Owners;
the issue of continued interference and spreading of misinformation
by a specific Pier 8 Owner, especially to "would-be" buyers
of Pier 8 Units. The message was clear. After a very, very short discussion,
it was acutely obvious that Owners have had enough. An Owner motion
from the floor was made, quickly seconded by numerous other Owners
that the Association take immediate legal action to stop this continued
problem and that all legal expenses be added to the individual's account
for collection when the Association prevails in the matter. A vote
was taken and the motion passed unanimously (once again) without any
opposition from any Owner in attendance. While obviously all in attendance
are aware of the specific individual's name, we are also certain that
even Owners NOT in attendance last night are aware of the re-occurring
problem and the individual involved. Mr. Sullivan has been released
to proceed immediately with any and all legal action deemed necessary
to put an end to this ongoing issue once and for all. For those in
doubt, the individual's name will become a matter of public record
with the imminent legal filing(s) over the next few days. Owners have
the commitment of the Board and Management to pursue vigorously the
matter and re-imbursement of any and all legal expense involved from
the individual.
Last night's Special Owner's meeting was also clear evidence of one
other fact. Pier 8 Owners once again stand united for the betterment
of Pier 8 as a whole. Your current Board, Management and legal counsel,
look forward to being a part of that movement in the weeks and months
ahead.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
*******
NOTICE *******
Pest Control Service Scheduled For Saturday, April 18, 2009 from 9:00
a.m. till 12:00 noon.
Mr. John Caballero's, of Caballero Pest Control, will be on the property
Saturday morning, April 18, 2009 from approx. 9:00 a.m. till 12:00
noon. They will once again attempt to visit and treat all 77 Units
however someone (an Owner, their tenant, their neighbor or other representative)
must be present during those hours for this effort to be successful.
This time, Mr. Caballero will start on the 3rd floor and work his
way down so, those on the third floor should expect him from 9:00
to 9:45 or so and the ground floor should probably expect him to start
there sometime later, say 11:00 to 11:15. As usual, Mr. Caballerio
will be providing us with a list of those Units that are actually
treated that day. This will of course also inform us as to which Units
were NOT able to be treated due to lack of anyone being present and
providing access into the Units. Please make arranges to have the
Unit accessible for treatment.
VERY IMPORTANT - If no one is at the Unit to allow access and a Unit
misses two (2) consecutive scheduled treatment dates, the Association
will demand that the Unit Owner have the Unit treated (at the sole
expense of the Owner) and that they provide the management office
with a copy of the invoice evidencing that treatment. The reason for
this is simple; if we don't routinely treat ALL Units then our efforts
will be ineffective as treatment of ALL Units is the only way to provide
an effective pest control program. We will also post this notice around
the property prior to April 18, 2009 and a copy of this notice has
been placed on the Pier 8 website bulletin board for future reference.
Thank you in advance for your patience, understanding and cooperation
on the morning of Saturday, April 18, 2009. On behalf of you Board
and Management, we thank everyone in advance for their assistance
and cooperation with this task.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: April 2, 2009
Subject: Exterior Renovation - Contractors Past Project references
The following are a list of projects submitted by each Contractor
as references evidencing their past project in the area:
Inman
Construction
Base
Contractors
E.
J. Milligan
These will also be handed out at the door prior to the Tuesday, April
7, 2009 Special Owner's Meeting at the New Orleans Yacht Club at 403
N. Roadway, New Orleans, Louisiana. Again, doors will open at 6:00
p.m. and the meeting will begin at 6:30 p.m. sharp.
We look forward to seeing as many Owner's as possible.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
****** IMPORTANT
NOTICE ******
Special Owner's Meeting, Tuesday,
April 7, 2009, 6:30 p.m.
Posted: March 29, 2009
Please accept this as an additional notice that a Special
Owner's Meeting will be held at the New Orleans Yacht Club at 403
N. Roadway, New Orleans, Louisiana on Tuesday, April 7, 2009; doors
will open at 6:00 p.m. and the meeting will begin at 6:30 p.m. sharp.
The topic will be that of proceeding with the exterior renovations
now that formal proposals have been obtained. A formal notice with
more complete information was mailed to each Owner on March 25, 2009.
Please review the information that was mailed and prepare any questions
you may have so that they can be addressed during the meeting. The
objective for this meeting is to have Owners vote will regarding the
desired contractor based on the bids obtained and the information
provided at the meeting.
For those who will not be able to attend the meeting, a Proxy
Form can be obtained here by clicking" on teh Proxy Form
links in this paragraph. Your completed Proxy
Form should be returned to our office no later than noon, Tuesday,
April 7, 2009. The Proxy
Form may be returned to our office via fax (504-889-1300) or scanned
e-mail to info@pier8condos.com.
In addition, the person you appoint as your Proxy may also bring the
Proxy
Form with them to the meeting where it will be recorded These
efforts are aimed at reaching as many Owners as possible in hopes
of achieving the highest attendance possible, in person or by Proxy.
As usual, your Rules and Regulations require that there be at least
33-1/3% of the Owners represented (in person or by Proxy) at the meeting
in order to hold this meeting. With that in mind, it is imperative
that as many Owners as possible attend this meeting or assign their
Proxy to another owner that will be attending the meeting. As reminder,
any Owner's account that is over 30 days past due will not be permitted
to vote, so we encourage everyone to please bring any such accounts
current prior to the meeting night.
The actual meeting will be limited to two (2) hours; doors open at
6:00 p.m. with actual meeting starting at, 6:30. The main objective
for this meeting will be the selection of a Contractor to proceed
with the exterior siding renovation and painting.
So, with that in mind, we are once again asking every Owner to please,
please, please, make every effort to attend this very important meeting
as we need the support of Owners wishing to continue moving Pier 8
ahead.
We look forward to seeing as many Owners as possible and thank you
in advance for your support in the weeks and months ahead.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: March 11, 2009
Subject: Bids Received for Exterior Renovation - Special Owner's
Meeting Notification
Request for bids were sent out to six (6) contractors during the
month of March 2009. Bids were received from three of the six (6)
contractors; the following outlines the various companies and their
respective total bid amounts or response status:
The McDonnell Group - Declined to bid the project
Inman Construction - $186,000.00
Base Contractors - $170,000.00
Devier Construction - Declined to bid the project
Trison Constructors - Declined to bid the project
E. J. Milligan - $172,926.00
Delivery times ranged between 3-4 months (from the time of release)
depending on weather conditions. All bids (copies attached) are based
on the Specifications and Sketches dated March 7, 2009 and January
25, 2009 respectively. All bidders are licensed Contractors in the
State of Louisiana, have (or will) provided evidence of both liability
and Workmen's Compensation, are willing to enter into a standard American
Institute of Architects - AIA A101 Standard Form of Agreement between
Contractor and Owner where the basis of payment is a Stipulated Sum.
In an effort to give Owners additional time to review these documents,
the Specifications,
individual Contractor
bids and the seven (7) page AIA,
A101 document can be seen (downloaded and printed) from the Bulletin
Board page of your Pier 8 website for those wishing to review the
entire document prior to the upcoming meeting.
While a copy of this notice, along with copies of the individual
bids/responses received from Contractors has been mailed to each Owner
on March 25, 2009, please accept this as a preliminary notice of the
Special Owner's Meeting regarding this matter set for Tuesday,
April 7, 2009 at the New Orleans Yacht Club at 403 N. Roadway, New
Orleans, Louisiana; doors will open at 6:00 p.m. and the meeting will
begin at 6:30 p.m. sharp. The sole issue at this meeting will
be Owner's consideration of the attached proposals in hopes of reaching
a decision. We will start with presentation of the proposals, followed
by open discussion (question and answer period) and ultimately a vote
on how Owner's would have the Board and Management proceed with this
project.
Once again, we thank everyone for their patience during this process.
As previously stated, the additional time spent on the "front
end" of this project will go a long way in avoiding problems
on the "rear end". Trusting this meets with the approval
of all, I look forward to our upcoming meeting.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of Pier 8 Condominium Association
From: The ALCOR Group, Property
Management
Date: March 11, 2009
Subject: Exterior Specifications released for bids
As previously decided by Owners at the recent Owner's Annual Meeting
& Elections, we have completed what we believe to be a comprehensive
set of specifications that will be used as part of the exterior renovations
process at Pier 8. Unfortunately, was not able to attach them to the
previous mass e-mail as PDF attachments are not permitted by the web
server. The General
Bid Specifications can be found on here for review and printing
by all. Simply click on the "General
Bid Specifications" link and a 3 page document will open
with the written General Bid Specifications. Then, click on the following
two Links for the associated drawings; "SK-1"
and "SK-2";
they too may be printed for your review and use.
We believe that the "General
Bid Specifications", along with the sketch drawings, will
go a long way to prevent any misunderstanding concerning what we expect
from any contractor involved with this project. The "Request
for Bids" have been sent out to five (5) General Contractors;
if you have General Contractors that you would like to see bids from,
simply forward the "General
Bid Specifications" (and sketches) to them and have them
return their bids to our office no later than noon, Monday March 23,
2009. The initial five (5) contractors are The McDonnel Group, Trison
Constructors, Base Contractors, Inman Construction and Devier Construction.
Should you have sub-contractors that you would like to have submit
bids for their particular crafts, you may want to have them contact
these General Contractors as I am sure they would be happy to entertain
bids from qualified subcontractors seeking work in the area.
Our intent is to get the bids back, review them quickly, forward
them by mail to Owners for their review with our recommendation and
an Owner's meeting date at the end of March or first week of April,
if at all possible so a final decision by Owners can be made at that
meeting regarding proceeding with a contractor to complete the work.
We would like to release the work quickly and move this project forward
so as to complete it prior to the summer months, again if at all possible.
Obviously, we have many other projects (i.e. walkways, rooftop a/c
electrical, landscaping across the front, etc.) but again, once we
know how much the big project is going to cost, we can then begin
to address (by priority) the remaining deferred maintenance issues
and improvement items that need to be accomplished at Pier 8.
Thank everyone for their patience during this process; the additional
time spent on the "front end" will go a long way to avoiding
problems on the "rear end". Trusting this meets with the
approval of all, I look forward to our upcoming meeting.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of The Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: February 19, 2009
Subject: Pier 8 - Owner's Annual Meeting and Elections
February 10, 2009
We wanted to provide everyone with a brief overview of the recent
February 10, 2009 Annual Owner's Meeting and Election results.
A year-end update of Pier 8 Income and Expenses was provided to all
in attendance (with handouts) as well as an overview of current financial
condition and collection issues along with the legal status of those
efforts.
ALCOR presented a slide presentation
of the exterior siding conditions around the property and answered
questions posed by Owner's in attendance. We discussed the use of
an outside Consultant to develop drawings and bid specifications to
be used in connection with the exterior siding project. An alternative
to have ALCOR develop general
specifications that could be used to ensure an "apples-to-apples"
bidding of the project without the additional cost associated with
use of a third party consultant, was also discussed; most appeared
to favor that alternative. The use of the industry standard AIA document
(to ensure compliance with industry standards) was discussed and majority
appeared to agree that this was the safest way to proceeded in an
attempt to avoid a reoccurrence of past issues surrounding this matter.
Three (3) preliminary proposal were presented by previous Board Members
and ALCOR. A motion was made and
seconded to develop the specification and have all interested/qualified
potential contractors "reduce" their bids to the AIA document
for presentation to Owners at a Special Owner's Meeting. Owner's will
decide (by vote as required under Pier 8 by-laws) which contractor
would be used to complete this project. Specifications will be available
by Wednesday, February 25th and will then be sent to licensed/insured
Contractors able to handle projects of this magnitude. Once the bids
are received, more than likely by March 15, 2009, a meeting date will
be set with a mail-out of the bids and copy of AIA document for Owner's
to review prior to the Special Owner's Meeting. At the meeting, an
open discussion will be held and a vote taken by Owners as to which
direction/contractor they wish to proceed with and whether or not
ALCOR will be retained to oversee/supervise
the project thorough completion. Our best estimation at this point
is that the Special Owner's meeting will be held by the end of March
and the project would take about three (3) months, once released by
Owner's at that meeting.
Various other smaller projects (i.e. front landscaping, front lighting,
rooftop A/C electrical repairs, etc.) were discussed and decisions
deferred (due to limited funds) until a few of the major issues (including
exterior siding issue/project) could be resolved.
Pet Amendment - The proposed pet Amendment was presented and open
discussion followed by those in attendance. In brief, the Amendment
permits existing pets (prior to January 10, 2009) at
Pier 8 (that exceeded the 25 lb weight limit) to remain at Pier 8
and be "grandfather" in under the Amendment. It is important
that all remember that this Amendment does not apply to tenants
as tenants are not permitted to have any pets within Pier 8 under
penalty of fine to the Owner of the violating Unit. Again, the 25
lb weight limit is still in place, that was not changed. After much
discussion, a vote was taken and the Amendment passed with 78% of
the votes cast in fair and 22% of the votes being opposed to the Amendment.
The Amendment took effect that evening. In addition, the Amendment
will be formally drafted for filing in the Public Records by Jerry
Sullivan, the Association's counsel of record. A printable copy of
the document will also be upload to the Pier 8 website on the Rules
and Regulations page so that all may review and print the document
as may be desired in the future.
Elections of Directors was also held and the following represents
the individuals elected as the 2009 Board of Directors. As mandated
by the By-laws, the new Board met within the required ten (10) days
(on February 19, 2009) following the Owner's Annual meeting and have
decide which Directors would hold the various Offices for the coming
year. The results of that meeting are:
Jason Faucheaux - President (3rd elected Director elected to a 3
year term
Sven Oertel - Vice President (1st elected Director elected to a 2
year term)
Lisa Kayser - Secretary (current term as a Director will expire February
2011)
Rachel Mathieu - Treasurer (2nd elected Director elected to a 3 year
term)
Elizabeth "Buzzy" McFerrin - Member At-Large (4th elected
Director elected to a 3 year term)
Once again, we congratulate the new Board of Directors on their election
and look forward to a productive year in the months ahead.
Trusting this meets with the approval of all, we look forward to
the upcoming Special Owner's meeting and Owner's direction as to how
they wish to proceed relative to the exterior renovation issue. Until
then, on behalf of your new Board of Directors and all of us at ALCOR,
we wish everyone a Safe and Happy Mardi
Gras celebration!
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
***************************************************************************
To: Owners of The Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: January 31, 2009
Subject: IMPORTANT PIER 8 NOTICE - Voting on Amendments
Many Owners may not be familiar with some of the By-laws and documents
governing Pier 8, specifically the voting process on Amendments. Given
the importance of the proposed Amendment, regardless of your position
on the issue, we want to ensure that all are "clear" on
the voting process before the meeting. With that in mind, here is
how the voting "works" when it comes to voting on Amendments
as outlined by Pier 8 Article VII, (b):
Article VII, Amendment
(b) A resolution adopting a proposed amendment must be approved
by the Unit Owners. Such approvals must be by not less than 66-2/3%
percent in number of all the unit Owners or 75% in number of the
unit Owners voting at a meeting of the Unit Owners at which a quorum
is present.
As written, it is possible for the majority of Owners to be "FOR"
or "AGAINST" a proposed Amendment and be over ruled by "75%
in number of Unit Owners voting at a meeting of the Unit Owners".
In other words, say 65 Unit Owners want an Amendment to "pass"
however, only 32 Unit Owners show up (or vote by proxy) at the meeting.
The amendment could fail with a 75% majority vote (24 votes)
of those present (or voting by proxy) at the meeting. Obviously, the
reverse can also happen; 70 Owners could be against the proposed Amendment
yet only 32 Owners show up (or vote by proxy) and the Amendment passes
with 75% majority vote (24 votes), whether present or by proxy.
With that in mind, if you are interested in a particular Amendment
("FOR" or "AGAINST") it is extremely important
that your communicate that position by being present to vote or giving
your proxy to someone who shares your opinion on the matter and who
will be present at the meeting to formally express that opinion. If
not, an Amendment could pass or fail when in fact the true majority
of Owners didn't agree with the outcome. The message here is VOTE,
in person or by proxy.
If you are not going to be at the February 10, 2009 meeting and
you don't have any one you feel comfortable with giving your proxy
to but you wish to vote on the upcoming proposed Amendment, simply
write on the bottom of the Amendment that was mailed to you "FOR"
or "AGAINST", sign your name (also print it), place your
Unit number on it. You can get it back to our office by fax (504-889-1300)
or scanned e-mail to info@pier8condos.com and we will register the
vote accordingly for you at the February 10, 2009 meeting. You may
also simply send it to the meeting with someone who will be attending
the meeting who can turn it in for you. Didn't receive the previous
mailing or proposed Amendment? You can obtain a copy here by clicking
on "proposed
amendment to the existing Pier 8 pet rule". Simply print
the proposed
Amendment out, state your position on it as being "FOR"
or AGAINST" and get it to us as outlined above. Regardless of
your position, we hope you will take the time to VOTE
on this very important issue.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: Owners of The Pier 8 Condominium Association
From: The ALCOR Group,
Property Management
Date: January 28, 2009
Subject: NOTICE OF PROPOSED AMENDMENT TO EXISTING PET BY-LAW,
RULES AND/OR REGULATIONS - PIER 8 CONDOMINIUM ASSOCIATION
We have received the attached
proposed amendment to the existing Pier 8 pet rule in our office
via e-mail on the evening of January 28, 2009. The e-mail requested
that this proposed amendment be forwarded to all Owners so that the
issue can be discussed and voted on by Pier 8 Owners at the upcoming
February 10, 2009 Pier 8 Annual Owner's Meeting & Elections. In
keeping with the request, and the required ten (10) day notice outlined
by Pier 8 By-laws governing such matters, formal written notice is
by given.
In brief, the proposed amendment deals with the grandfathering in
of "Owner's" pets (not tenants) that have previously been
in violation of the current Pier 8 By-laws, Rules and Regulations.
Under the proposed amendment, any such pet that existed on Pier 8
property prior to January 10, 2009 would be grandfathered in and permitted
to remain.
This issue will be brought before Owner's for a vote at the upcoming
Owner's Annual meeting so we encourage Owners (regardless of your
position) to attend the meeting if you wish to be heard or vote on
the matter.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
*****************************************************************************************
To: All Pier 8 Condominium Owners
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Date: January 22, 2009
Subject: Pier 8 - Annual Owner's Meeting and Elections, Tuesday,
February 10, 2009
Please accept this as an initial notice that the Annual Owner's Meeting
& Elections will be held at the New Orleans Yacht Club at 403
N. Roadway, New Orleans, Louisiana on Tuesday, February 10, 2009;
doors will open at 6:00 p.m. and the meeting will begin at 6:30 p.m.
sharp. A formal notice with more complete information will be
mailed to each Owner within a day or so.
A Proxy/Nomination form will be included in the formal mailed notice
and can also be download by clicking on February
10, 2009 Owner's Annual Meeting - Proxy/Nominations form.
In addition to this posting, a copy of the formal meeting notice has
been posted in the bulletin Board near the mailboxes and in the laundry
room at Pier 8. These efforts are aimed at reaching as many Owners
as possible in hopes of achieving the highest attendance possible.
As a reminder, please remember that your Rules and Regulations require
that there be at least 33-1/3% of the Owners represented (in person
or by Proxy) at the meeting in order to hold this meeting. With that
in mind, it is imperative that as many Owners as possible attend this
meeting. As further outlined by your Rules and Regulations, any Owner's
account that is over 30 days past due will not be permitted to vote
nor are they permitted to hold office as a Director, so we encourage
everyone to please bring any such accounts current prior to the meeting
night.
The actual meeting will last for two (2) hours, 6:30 p.m. to 8:30
p.m. with the main objectives being the holding of elections and updates
to Owners on various projects the most important of which is the exterior
siding renovation/repairs. We are in need of Owner input/decisions
concerning the exterior siding project in order to continue "pushing
forwarding" to get it started as quickly as possible.
So with that in mind, we are once again asking every Owner to please,
please, please, make every effort to attend this very important meeting
as we need your support on a few issues that can only be resolved
by the support and input of Pier 8 Owners wishing to continue moving
Pier 8 ahead.
We look forward to seeing as many Owners as possible and thank you
in advance for your support in the weeks and months ahead as we continue
to improve Pier 8.
Sincerely,
Al Oglesby
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Association
*****************************************************************************************
To: All Pier 8 Condominium Owners
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Date: January 19, 2009
Subject: Pier 8 - Pest Control Service Scheduled for Saturday,
January 31, 2009
Mr. John Caballero's, of Caballero Pest Control, will be on the property
Saturday morning, January 31, 2009 from approx. 9:00 a.m. till 12:00
noon. They will attempt to visit and treat all 77 Units however someone
(an Owner, their tenant, their neighbor or other representative) must
be present during those hours for this effort to be successful. Mr.
Caballero will start on the ground floor and work his way up so, those
on the ground floor should expect him from 9:00 to 9:45 or so and
the third floor should probably expect him to start up there sometime
later, say 11:00 to 11:15. Upon completion, Mr. Caballerio has agreed
to provide us with a list of those Units that are actually treated
that day. This will of course also inform us of which Units were NOT
able to be treated due to lack of anyone being present and providing
access into the Units. Please make arranges to have the Unit accessible
for treatment.
VERY IMPORTANT - If no one is at the Unit to allow access and a Unit
misses two (2) consecutive scheduled treatment dates, the Association
will demand that the Unit Owner have the Unit treated (at the sole
expense of the Owner) and that they provide the management office
with a copy of the invoice evidencing that treatment. The reason for
this is simple; if we don't routinely treat ALL Units then our efforts
will be ineffective as treatment of ALL Units is the only way to provide
an effective pest control program. We will also post this notice around
the property prior to January 31, 2009 and a copy of this notice will
be placed on the Pier 8 website bulletin board for future reference.
Thank you in advance for your patience, understanding and cooperation
on the morning of January 31, 2009. On behalf of you Board and Management,
we thank everyone in advance for their assistance and cooperation
with this task.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
*****************************************************************************************
To: All Pier 8 Condominium Owners
From: The Pier 8 Board of Directors
Date: January 9, 2009
Subject: Pier 8 - Year End Message From Board of Directors
As we look forward to 2009, we wanted to take this opportunity to
reflect on 2008 and the progress made at Pier 8. With the hiring of
ALCOR as our property management team, we have seen a complete turnaround
with regard to organization and execution of our priorities. Al and
Tina have worked tirelessly to insure that the association is back
on track and serving homeowners equally and professionally. For that
we are very thankful.
The overall condition of the property has improved along with the
collection of delinquent accounts. Our website is one of the best
and provides future and current homeowners with up to date information
and marketing. Increasing homeowners' equity is and should be the
main focus of the association. We have had issues in the past with
negative activity coming from a few homeowners' at Pier 8 and the
real estate community and now have in place Rules and Regulations
that prohibit such activity. The updated Rules and Regulations will
be fully enforced for the betterment of the association.
While we have made progress, we still have the after effects of Hurricane
Katrina to address. Our lawyer, Jerry Sullivan, is working with vendors
who have made claims against the association and, hopefully, these
will be resolved in our favor. Jerry is also pursuing RG's insurance
company for poor performance as it relates to building repair. It
is our intention to re-coup as much money as possible.
With regard to our financial picture, the board has been very cautious
with expenditures and it is projected in 2009 that we can allocate
money back to the reserve account. Unfortunately, the association
spent over $50,000 in legal expenses to settle claims by vendors,
law suits from several homeowners and placing liens on units that
were past due on fees and assessments. It is important to remember
that the only revenue stream for Pier 8 is through monthly fees and
assessments. Any homeowner who files suit or a claim against the association,
is in effect taking money from themselves and their neighbors. Let's
all try and resolve issues without having to pay legal fees.
You will be receiving information from ALCOR with regard to the Annual
Homeowners' Meeting in February. There will be four open board positions
at that time.. Lisa Kayser is the only position that will not be up
for reelection.
For those of you who have not served and want to contribute in a positive
and well meaning manner, please consider running. The association
needs professional and conscientious members to continue the progress
at Pier 8 and uphold the Rules and Regulations.
We wish you all a very Happy New Year.
Pier 8 Board of Directors
***************************************************************************************
To: All Pier 8 Condominium Association Owners/Members
From: The ALCOR Group and
your Board of Directors
Date: December 22, 2008
Re: Pier 8 - Happy Holidays!
Well, it's Christmas again and we hope everyone is ready; I know
we're looking forward to some time off with friends and families.
In keeping with having a safe Holiday Season and a good Year's celebration,
we wanted to remind everyone of the hazards involved with the handling
of fireworks, especially the kids. While it is strictly against the
law to use fireworks anywhere in Orleans Parish (which of course includes
the Pier 8), for those of you that will be visiting other areas that
do permit the use of fireworks, we encourage you to handle them with
extreme caution and WATCH THE KIDS. Every year we hear about children
who received injuries while using or being around the use of fireworks,
not to mention the potential for damage to property. I am sure that
everyone would agree that we certainly don't want to experience a
"setback" at Pier 8 by the illegal use of fireworks in and
around Pier 8 grounds and buildings in the days ahead. Please, keep
your children and property safe by NOT using fireworks within the
Pier 8 development.
From all of us here at ALCOR and on behalf of your Board of Directors,
we wish everyone a safe and Happy Holiday Season!
Sincerely
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium Assoc.
****************************************************************************************
Date: November 17, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Overview - Owner's Special Meeting - Tuesday,
November 11, 2008
My apologize for taking a few days to get a summary report to the
Owners that were unable to attend last week's Special Owner's meeting.
Let me begin by thanking Buzzy McFerrin for allowing us to meet at
the New Orleans Municipal Yacht Club. Buzzy, we appreciate the help
and kindness extended to us during the evening.
We had 45 attendees and I believe one of the more productive meetings
for Pier 8 in recent time. The meeting began with an overview of our
financial conditions. A review was made of collections and the efforts
put forth by all to the end. As it turned out, we had settled a long
standing delinquency with the collection of nearly $15,000.00 from
one Unit a few days prior to the meeting and a second Unit committed
to paying off it's nearly $7,000.00 debt to the Association next month.
Collections will remain at the top of our priority list until Pier
8 receivables are once again under control.
Collection of the May 2008 Special Assessment has also continued.
With one or two exceptions, everyone has either completed their payments
or has been set-up on a mutually agreeable payment plan with a nominal
surge charge for the added liberty. The one or two that have not responded
have been turned over for legal collections and will be charged any
legal expenses incurred as a result of their failed response.
We discussed the recent change to Vista Landscaping headed up by
Mike Casey, a residing Unit Owner at Pier 8. For basically the same
fee as the previous lawn service, we felt that Mike and his team will
bring added value to Pier 8 in the weeks and months ahead.
We discussed various past roof issues, specifically the lack of proper
attaching of conduits blown off during Gustav as well as the improper
handling of pitch pockets leading to various roof leaks. These issues
that have been corrected. We are turning our attention to the last
immediate roof related concern which is the deplorable condition of
a/c disconnect/fuse boxes; many have deteriorated to the point that
they are exposed to water and the elements resulting in serious safety
concerns. We will identify the individual Units involved, obtain pricing
to resolve the matter and each Unit Owner involved will receive a
bill for the replacement or repair of the disconnect/fuse box serving
their Units. We encourage all Owners to use reputable service companies
when having their rooftop Units serviced in the future to ensure proper
handling of theses issue. We do not expect this to be a major expense
to the unit Owners involved. It is an issue that must be addressed
before a serious accident occurs as the result of the deferred maintenance
involving these items.
We reviewed a few of the less visible yet significant accomplishments
since July 1, including the inspection to the fire alarm system that
had not been inspected since installation in April 2007. This is an
annual State required inspection and one that the insurance carrier
would look for should we have a fire event. The fire extinguishers
were also out of inspection; this has been corrected.
One of the other major topics was that of the exterior renovation.
Everyone is committed to accomplishing this however we want to accomplish
it without a repeat of the previous fiasco regarding this issue. We
will employ a professional consultant to advise us as to what needs
to be done and then have them establish a set of specifications that
will then be put out for bid by qualified contractors. First and foremost,
this will ensure that we are getting what we want, materials that
match and installed properly and that all bids are on an apples-to-apples
basis. One of your Board members, Elaine Coari, went through an extensive
bid process relative to paint contractors and we hope to use much
of that information and one of those contractors for the final painting
of the exterior once repairs/renovations are completed and ready for
paint.
The pet issue/rule was yet another major issue of discussion. In
brief, short of the "no pets by tenants" rule, the issue
of over the 25 lb weight limit pets has been put on hold while we
afford an Owner the opportunity to survey Owners relative to their
desires regarding this existing rule. The Board and Management agreed
that the Owner should be given some time and we granted the Owner
until December 31, 2008 to have the current rule amended or changed.
If this effort is unsuccessful, effective January 1, 2008, we will
have no choice but to enforce the current rule as written. In brief
that means that any pet(s) (individually or together) that exceed
the current 25 lb weight limit will need to be removed from Pier 8
property immediately. Please understand that I myself own two (2)
dogs and fully understand the meaning of such a move however, as your
Management Company, we are left with no choice but to enforce the
rules that you as Owners have given us to work with. As always, we
are not for or against the rule, we are simply charged with the duty
of having to enforce those rules that you as Owners give us to work
with.
Many Owners expressed their dissatisfaction with a number of other
rule infractions and the continued disruptive behavior of a few within
Pier 8. In brief, Owner's have had enough and they were extremely
clear on this issue during the meeting! A resolution was presented
from the floor by an Owner that basically stated the Association,
its Board and Management Company were not to spend any more time responding
to ridiculous request and behavior other than fines were appropriate.
The resolution was put to a vote on the floor and passed unanimously
without a single opposing word sending a clear message to those few
that Owners have had enough. Those "bent" on continuing
the senseless games and behavior at Pier 8 will be subjected to fines
and any other legal recourse available to the Associaton as a whole
in the weeks and months ahead. Owners spoke loud and clear on this
issue and the Board and ALCOR are committed to seeing to it that their
desires are fulfilled. If you have something constructive and need
the Association's help, we are there for you; if on the other hand
it is totally unreasonable, the Association, it's Board or Management
team will not waste their time on such issues any longer. Anyone having
a problem with that, needs to address the ruling majority of Pier
8 from this point forward.
Finally, the Board voted on and accepted a revised set of the previous
rules and regulations. While we are having to "back-up"
and incorporate the resolution presented and passed on the floor at
the Owner's meeting, we have uploaded a set of the rules as accepted
by the Board at a Board meeting that preceded the Special Owners meeting
last week. Please take a moment to review them on the website under
the General Rules and Regulations; it's the last document date November
11, 2008. We will upload the revised set that will include the resolution
shortly.
Again, I look forward to our now common goal of bring Pier 8 back
to its previous status in our community and feel reassured after last
week's meeting that we will in fact be successful in that common effort.
I look forward to working with all Owners in the weeks and months
ahead and you have the commitment of the Broad and our management
team in having the most transparent management and Broad that Pier
8 has ever experience in its' history; there are no secrets and the
records are open to all responsible and interested Owners. We are
here to serve your needs despite the efforts of the few who shall
surely soon fade into the landscape.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
***************************************************************************************
Date: October 21, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Owner's Meeting Notice - Tuesday, November
11, 2008 - 6:00 p.m. to 8:00 p.m.
We were able to confirm a location for the proposed November Owner's
meeting mentioned in the past few weeks.
Please accept this as an additional notice that the Owner's meeting
will be held at the New Orleans Yacht Club at 403 N. Roadway, New
Orleans, Louisiana on Tuesday, November 11, 2008 beginning at 6:00
p.m. sharp. A special thanks to Buzzy McFerrin for allowing us to
use the meeting facility room once again.
This notice will be formally mailed to all Owners, in addition to
being posted on the website bulletin board and in the usual locations
in and around the property in hopes of reaching as many Owners as
possible and gaining their attendance at the upcoming meeting
The meeting will last for two (2) hours and the main purpose will
be to update Owners on significant issues and answer questions of
any desired topics. In an effort to cover as much information and
answer as many questions as possible, a reasonable time will be allotted
to each person wishing to speak out, so please your cooperation and
support to this end would be greatly appreciated. While much progress
has been made in the past four (4) months, there is still a great
deal to be accomplished in the weeks and months ahead. We intent to
provide updates on where we have been, where we are and where we are
headed relative to a few of the remaining major issues facing Pier
8 as an Association. We will also have some photos to illustrate some
of the conditions encounter and corrected as well as some of those
yet to be corrected. The intent is to provide you with a more complete
"snap shot" of where we believe Pier 8 is now and were we
would like to take it.
As your new property manager, I am asking every Owner to please,
please, please, make every effort to make this meeting as we need
your support on a few issues that can only be resolved by the support
of Pier 8 Owners wishing to continue moving Pier 8 ahead and away
from some of the remaining past ills that continue to plaque Pier
8.
I look forward to seeing as many owners as possible and thank you
in advance for your support in the weeks ahead as we continue our
now common goal; the continued improvement of Pier 8.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
*****************************************************************************************
Date: October 21, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - A few more quick updates/reminders
Water turned off today without any notice - We wanted to advise everyone
what the water outage earlier today was all about. The water was turned
off all along Lake Marina Drive at about 11:15 a.m. this morning by
the City without any prior notice to any of the buildings being serviced
by that water line. The N.O. S&WB removed a faulty fire hydrant
at the end of Lake Marina Drive near Westend Blvd. and had water back
on by about 12:00 noon
.the first time. We then received a second
call about 45 minutes later from the same N.O. S&WB foreman (Warren)
who stated they had installed a bad fire hydrant and needed to remove
it and replace it again with yet another one so they turned the water
off at 1:30 p.m. As of this e-mail, it had not been turned back on
but expected to be on shortly. Just wanted to let everyone know what
that was all about and that no prior notice was given to us or anyone
that we are aware of.
Buggies/carts - We have received a couple of calls about the buggies/carts
used to carry items to and from cars. It is our understanding that
these are normally stored/returned to the stairway where the pool
pump equipment is and the stairway near the laundry room. Please remember
to return the buggies/carts to these areas when you are finished using
them so that they will be available for your fellow Owners; you cooperation
in this matter would be greatly appreciated by all.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
****************************************************************************************
Date: October 16, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - A few Quick reminders
A few quick reminders this evening.
First, you may have noticed the no parking sign installed at the
front of the property by the city; they will be installing another
one shortly. Please be advised that it is my understanding that they
(NOPD) are once again ticketing cars that park on the street/sidewalk
across the front of Pier 8. I strongly encourage all not to park there
anymore and to please begin using the on-site parking at Pier 8. This
would also go a long way for improving the curb appearance of Pier
8 overall.
Secondly, we have received a complaint from an Owner who is tired
of stepping in dog mess in the grassy areas adjacent the entrance
gate and drive lane near the rear building stairs. Please be advised
that the two security cameras that view both of those areas will be
used from this point on to determine who the violator is. Once again,
we ask everyone to take their pets outside of the gated area and if
there is an accident, pick it up. Your fellow Owners are tired of
stepping in it.
On behalf of you fellow Owners, we thank all violators for their
immediate compliance you're your rules and regulations regarding these
matters.
Finally, don't forget that the pest control service will be provided
this Saturday morning between the Hours of 10:00 a.m. and noon so
please make arrangement to have someone present so that they may access
your Unit.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
***************************************************************************************
Date: October 9, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Parking Space issue
Need to advise everyone of an issue that is beginning to "grow"
especially in the past week or so. This involves the parking of cars
in other Owners reserved/assigned spaces.
The best we can figure is that over recent months, many Owners had
not yet returned and therefore many parking spaces appeared not to
be being used. As you know, many Owners are now back, as well as the
new Owners that have purchased Units that may have been previously
vacant, thus the problem. Please do not park in any space that is
not assigned to you. We believe that we now have an accurate record
of which space belongs to what Unit. With that in mind, if you are
uncertain of your assigned space, please let us know and we will provide
you with that information. In the meantime, please, be considerate
of your fellow Owners by only parking in your assigned space and not
theirs.
Thank you in advance for cooperation.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
****************************************************************************************
Date: October 9, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Pest Control Service scheduled for Saturday
morning, Ocotber 18, 2008
As I have discussed with many of you over the past several weeks,
we have been addressing the issue of restoring pest control services
at Pier 8. The matter/issue has been quite involved and I will be
happy to share details of our efforts at the planned November Owners
meeting, date to be announced shortly. The update will include the
bids secured to date and other activities involving this issue over
recent weeks. For now, please be advised of the following.
Mr. John Caballero's, of Caballero Pest Control, initial call to
me was on October 6, 2008; I returned the call that day. Mr. Caballerio
and I have spoken again this date, October 9, 2008. We have agreed
that his firm will be on the property Saturday morning, October 18,
2008 from 10:00 a.m. till 12:00 noon. They will attempt to visit and
treat all 77 Units however someone (an Owner, their tenant, their
neighbor or other representative) must be present during those hours
for this effort to be successful. Upon completion, Mr. Caballerio
has agreed to provide us with a list of those Units that ARE actually
treated that day. This will of course also inform us of which Units
were NOT able to be treated due to lack of anyone being present and
providing access into the Units. We will be attempting to have the
property treated every other month from this point forward and will
always provide several days notice so that Owners can make the needed
arrangements to have someone at the Unit during the scheduled treatment
dates and time.
VERY IMPORTANT - If no one is at the Unit to allow access and a Unit
misses two (2) consecutive scheduled treatment dates, the Association
will demand that the Unit Owner have the Unit treated (at the sole
expense of the Owner) and that they provide the management office
with a copy of the invoice evidencing that treatment. The reason for
this is simple; if we don't routinely treat ALL Units then our efforts
will be ineffective as treatment of ALL Units is the only way to provide
an effective pest control program. We will also post this notice around
the property prior to October 18, 2008 and a copy of this notice will
be placed on the Pier 8 website bulletin board for future reference.
Thank you in advance for your patience, understanding and cooperation
on the morning of October 18, 2008. This will resolve yet another
long standing issue at Pier 8.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
****************************************************************************************
Date: October 3, 20088
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Exterior wall work - adjacent entrance gate
By now, those who reside at Pier 8 have seen the emergency work going
on to the east exterior wall of the front building adjacent the entrance
gate. Having now completed that initial investigation into this issue,
we wanted to update everyone with factual information concerning
the matter.
A water leak issue within Unit 101 was brought to our attention about
two (2) weeks ago. Upon investigation, we ultimately discovered that
water had been leaking into a portion of that Unit from the over lying
water heater in Unit 201. At the same time, we suspected that there
may be water entering the Unit via the east exterior wall as well.
The interior sheetrock was removed and we confirmed the fact that
water had been entering from the exterior wall. I addition, we found
active termites within the wall, including a couple of termite nests.
This lead to the need for removal of the exterior siding in that area
so that we could determine the exact point of the leak, the reason
for the leak and the full extent of damage.
As many of you have seen, the extent on the exterior plywood planking
and tug and grove siding extended basically to the roof including
two of the exterior architectural columns on each side of the windows
leading to the roof; IMPORTANT! These columns have no structural
value and are merely decorative.
In the end, we have removed six (6) different termite nests from
various areas of this wall indicating that this situation has existed
for some time. Due to the water penetration through the tug and grove
siding, the termites, once established in the wall, had no need to
return to the ground as they normally would for their water source;
this of course resulted in no recent normally visible tracks at the
foundation, making them nearly impossible to detect during normal
inspection.
The repairs are underway and the contactor will work through the
weekend to complete the majority of the work making the building water
tight. The Owner of Unit 101 has elected to have double insulated
windows installed (at their expense) and those will take about a week
and a half to arrive so you will see plywood over those areas until
the new windows arrive. An insurance claim has been opened by the
Owner and the Associations in hopes of recouping the respective related
expenses relative to this event. Because the work has required a great
deal of "discovery" as we proceeded over the past few days,
we proceeded with an initial "not to exceed" price of $10,000.00;
the contractor (Local Helping Locals) advised us yesterday that they
expect to come in below the "not to exceed" price now that
we believe we know the full extent of the damage. Now for the rest
of the story.
At this point, it is our belief, (based on the evidence to date)
that water penetrated this exterior wall from the bottom of the wall
where it meets the foundation (probably from flooding in this area
prior to the recent drain cleaning), also from what we believe to
be some abandoned exterior dry heater vents and from the new horizontal
joint created during the replacement of the lower portion of the tug
and grove vertical siding following Katrina. With that in mind, the
horizontal "joint" is of great concern to us and we will
be considering the potential extent of this issue (relative to similar
walls around Pier 8) prior to any painting of the exterior; this will
not delay or efforts to complete our dealings with the previous contractor,
obtain a professional scope of work for the exterior renovation (including
painting) as we will make the needed determination as we proceed with
development of the scope, specs and re-bidding of the desired work.
A complete update will be provided at the proposed Owner's meeting
in November and that date will be announced shortly within the next
two weeks or so.
Finally, and as a reminder, the purpose of the November meeting is
to bring all Owners together, provide them with factual updates. Updates
will be provided on this and the many other issues that have been
addressed since ALCOR assumed
management responsibilities in July as well as anticipated issues
that will be addressed in the weeks and months that follow.
As always, on behalf of your Board and all of us here at ALCOR,
we thank you for your patience and understanding as we continue to
move Pier 8 back to a normal status. As always, any Owner with questions
regarding this or any other issue, are welcome to contact me directly
by phone or e-mail and I will do my best to answer/address any questions
or concerns. As usual, we will not respond to any ridiculous
or unprofessional e-mails dealing with misinformation or hypothetical
scenarios. Thanks again for you help and support in bring Pier 8 back
to its pre-Katrina status and values.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
***************************************************************************************
Date: September 23, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Rear Elevator out of service
Otis elevator arrived on the property today to replace the leaking
packing on the rear elevator. They called about 2:30 p.m. this afternoon
and advised that they apparently sent them the wrong packing. So as
not to damage the elevator, they have taken it out of service again.
The correct part is being sent in overnight and they hope to have
the elevator back in service by tomorrow afternoon, Thursday at the
latest.
Thanks for your patience and understanding.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
****************************************************************************************
Date: September 23, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Update - Various Issues
With the storms and most of that related work behind us, we wanted
to give everyone an update on issues that we have been working on
over the past several weeks. Let me begin by apologizing for the length
of this update however, there are simply so many issues yet to be
resolved at Pier 8 that I want to cover a few of the major ones all
at once. Following this update, you will begin receiving routine updates
on additional unresolved issues until they are resolved. Please take
a few minutes to read the entire following update.
Collection of Special Assessments - To date we have collected a total
of $111,505.10 or approximately 64% of the total Special Assessment;
the bulk of the remaining portion will be received via the original
five (5) payment plan that will be completed in October. A few Owners
had sent in letters (prior to ALCOR assuming management responsibilities
at Pier 8) pleading "hardships". In an effort to work with
those Owners and avoid incurring additional legal fees to the Association,
we have sent those Owners letters offering an extended payment plan
in exchange for a nominal "Service Charge" fee being added
to the remaining amounts due; most responded favorably; we have only
had one (1) take issue with the service charge and I will address
that issue with the Owner in hopes of resolving their dissatisfaction.
For the few that simply chose not to acknowledge or respond at all
relative to payment of the Special Assessment, legal demand letters
have been mailed to them; follow-up to those letters have resulted
in liens being placed against their Units. As a direct result of those
efforts, in the past couple of weeks, two (2) Owners have paid the
amounts in full and another has pledged to pay the remaining balance
in full by November on both of their Units. In fairness to those Owners
who have paid their Special Assessment, we will continue to follow-up
on this issue with the pursuit of judgments, garnishments and application
for Sheriff Sales if needed.
If we take the time to think these issues through rather than employing
a "hot-gun" approach, I sincerely believe that the issues
at hand can be addressed with the funds available to pier 8.
Exterior siding renovation - As of this date, despite a few phone
conversations with the original contractor (Martin G. Fasulla), the
contractor that filed a suit against Pier 8 for non-payment of the
remaining balance, has failed to respond to our further efforts to
reach a mutually agreeable compromise. A compromise would have allowed
us to proceed with completion of the exterior renovation using another
(yet to be determined) contractor. With that in mind, we will advise
the Association's counsel to proceed with filing the needed document(s)
relative to this issue so that we can proceed with the exterior renovation
process in the weeks ahead. Our recommended approach will be to have
a specification drafted by a competent Architectural firm which will
in turn enable us to solicit bids and avoid a re-occurrence of the
previous problem relative to terms and specification surrounding this
task. Updates will be provided as we progress through the process
and we will work to complete an exterior renovation as quickly as
possible.
Unfinished interior renovation related issue - As previously stated,
with each passing week since assuming management responsibilities
at Pier 8, we have continued to learn of unfinished interior related
issues. Many of those issues are being handled to the satisfaction
of the Owners involved and we will continue that effort until all
unresolved issues are completed. For the most part, the items are
more or less "punch list" related making it extremely difficult
for us (ALCOR) to understand why these issues have not been previously
resolved. Regardless of the reason, we are committed to handling each
and every issue to a successful completion.
Roof related - Over the past several weeks, we have studied and addressed
a number of roof related issues, some of which have been causing leaks
into various Units. Last week, we resolved a number of these issues
including the correct "filling" of pitch pocket and sealing
of "roof jacks". In addition we have also sealed around
the enclosures that had been installed around pitch pockets. While
we are uncertain why the enclosures were installed, it was cheaper
and more efficient to seal the boxes rather than remove them. The
electrical conduit that had been installed (unsecured) atop roof and
which blew off during Gustav has been re-installed and properly secured
as it should have been originally. We still have a number of electrical
related concerns with individual a/c rooftop a/c units and we will
finish identifying those unit (relative to the Condo Unit they serve)
and will begin advising individual Owners of the need to remedy those
issues quickly so as to avoid any further risk to Owners/occupants
and the buildings themselves.
Violations of Rules and Regulations - As called for by Owners, we
have sent out numerous "Initial violation Notices" to various
Owners asking that they correct the violations within a specified
time. For those that are not resolved and/or who fail to respond within
the time specified, we will follow-up with the appropriate fines in
the weeks ahead. Hopefully, those Owners will respond and avoid the
need for legal action resulting in additional expense to the Association
and its Owners.
Protocol - I believe everyone would agree that with any organization,
there must be a clear line of communication to address any questions,
concerns and issues as they arise; the Pier 8 Association is no exception
to that standard operating procedure. In an effort to re-establish
the correct line of communication, and as stated at our July Special
Owner's meeting, we ask that all questions and concerns be directed
to the Management office. This will go a long way to reduce wasted
time on everyone's part relative to any issue. If it is a Board related
matter, we (Management) will take it to the Board and will respond
to you with appropriately. If it happens to be a legal matter, we
will consult with Counsel and again respond to the question or concern.
In an effort o have peace and harmony prevail in and around Pier 8,
we ask everyone's cooperation in this effort. In the long run, it
will prove to be the prudent way to proceed and reduce duplicate efforts
and expense to the Association. Above all, we again ask that everyone
disregard rumors; I believe it has well been established that there
are a few individual in every Association (Pier 8 included) who seem
to enjoy "stirring the pot". Don't empower them; ignore
them. If you are not sure, call or e-mail me; I give you the straight
answer, good, bad or indifferent.
E-mails - Let me be clear on this once again. We (Management) will
not waste our time on ridiculous e-mails (especially the mass e-mails)
that are obviously sent to with the sole purpose of "stirring
the pot". It's a waste of time and serves no purpose but to empower
the few that have nothing better to do with their time. I submit to
you that if their efforts were spent constructively at Pier 8, Pier
8 would be much further along with many of these unresolved issues.
In summary, Pier 8 has numerous outstanding issues that we will continue
to work on and that we will resolve in the weeks ahead. Shortly, we
will announce a date and time for yet another Special Owners meeting
wherein we can share additional details on these and other issues
facing Pier 8 as an Association. Over the years, we have learned that
pictures are truly "worth a thousand words". With that in
mind, we will have a slide presentation to evidence some of the conditions
encountered and resolved since assuming management responsibilities
at Pier 8. Until then, should any owner have any question, please
do not hesitate to contact Management and we will make every effort
to answer any questions and address any concerns.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
***************************************************************************************
Date: September 15, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Hurricane Ike - Pier 8 Update
While at the property this morning, Ron Bimes pointed out that one
of the Barb-Q pits had been left burning, apparently since last night.
Please remember to turn them off when finished to assist by saving
on the natural gas bill and the wear and tear on these units. Your
assistance would be greatly appreciated. Thanks Bimes for the heads-up
on that issue.
Also, please be advised that we have sent out a few initial notices
to a few Owners who took part in last Sunday's Sept. 7th) late night
pool activity that went on till after 1:00 a.m. Monday morning, September
8th. This has become an apparent repeated issue so we want to give
everyone a fair "heads-up". There will be no further "initial
notice" letters regarding after hours excessive noise, especially
around the pool area. Any future complaints will be handled accordingly
and the Association will pursue the matter to the fullest extent possible.
Owners have had enough and they want this game stopped.
Please, be considerate of your fellow Owners; lets "shut it
down" at 11:00 p.m. in keeping with your rules and regulations.
If you are going to be out in the common areas after 11:00 p.m., at
least keep it down in consideration for those who are trying to sleep.
Thanks in advance for the cooperation of those few Owners involved
in after hours activities around the pool; your continued cooperation
would be greatly appreciated so that our efforts/time can be spent
solving other ongoing Pier 8 issues in need of attention.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
***************************************************************************************
Date: September 12, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Hurricane Ike - Pier 8 Update
Good evening Pier 8 Owners:
Well, as many of you may know by now, the front ground floor Units
came within inches of taking on water this morning due to the failure
of New Orleans to close the two (2) gates into the Marina area across
the street. We arrived on the property this morning at about 10:00
a.m. to find water flowing literally flooding Lake Marina Drive and
Pier 8. We called the Levee Board and ECO to advise them and they
both insisted the gates were closed. Long story made short, they managed
to get both gates closed around 11:35 a.m. Within 15 minutes of the
gates being closed, the fenced in patio areas were totally drained
and no water entered any Units that we are aware of.
With that behind us, lets return to the Gustav damage. Overall, Pier
8 fared well. We have some electrical conduit that serves parking
lot light in the east packing area that was not properly anchored
was blown off during Gustav this is the conduit that can be seen between
the front NE building and the East building. We have an electrical
contractor scheduled to come in Monday morning. The breaker has been
turned off so you will notice some of those lights not working over
the weekend.
We also had sheet metal blown of some of the skylight extensions
at the roof leave; the sheet metal that we could find was reinstalled
and we will have some new sheet metal installed on the remaining ones
as quick as we can obtain new sheet metal pieces made. We should have
them back on next week.
We also had a number of "pitch pocket" roof covers blown
off; those were found on the roof and reinstalled. During the roof
inspection,, we found numerous electrical box covers to individual
a/c units missing exposing the electrical components to the elements;
these will have to be replaced. Again, al in all, Pier 8 fared well
over the past two weeks and we will work to have the few issues resolved
by the ends of next week.
On a side note, we want to remind all pet Owners that pets are to
be walked outside of the fenced in common areas when being taken out
to "do their business". Everyone's cooperation and consideration
for your fellow Owners would be appreciated regarding this ongoing
issue.
Well that's about it for now. After the past two (2) weeks of weather
related concerns, we hope everyone enjoyes a relaxing and quiet weekend
at Pier 8.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
***************************************************************************************
Date: September 3, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Gustav - Pier 8 Update
Good evening Pier 8 Owners:
We visited the property this afternoon. For those who may have missed
our previous e-mails or web postings over the past few days, Pier
8 has been returned to normal operation with electricity, water and
sewerage services working. There was very minimal damage that will
need to be repaired over the next few days. Some clean-up will also
have to be completed.
A special thanks to Bob Bassett for his continued updates during
the course of the storm and his efforts to keep things going as well
as those that pitched in with moving the pool furniture and the clean-up
this far. We will be posting a "Gustav" page on the Pier
8 website shortly and will advise when they have been uploaoded for
viewing.
To those who will be returning to the city over the next few days,
we wish your family and friends a safe trip home.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominiums
***************************************************************************************
Date: September 1, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Gustav - Pier 8 Update
Good evening Pier 8 Owners:
I spoke with Bob Bassett a few minutes ago 6:00 p.m; Bob stayed at
Pier 8 during the storm. He stated that Pier 8 fared well with no
flooding. They lost power this morning at about 9:00 a.m. and it has
NOT been restored as of 6:00 p.m. Monday evening; of course he has
no idea when it will be restored.
That's all we have for now but it looks like Pier 8 was spared any
major damage at this point. Will let you know if we get any news worth
of reporting.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium
***************************************************************************************
Date: August 30, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Gustav - now a category 4 off of Cuba
It appears, at this point, that there will be at least a few people
who are electing to remain at Pier 8.
Depending on how the storm progresses, we will plan on more than likely
be on site tomorrow morning to assist with the storing of pool furniture
in the office, laundry and/or Morgan portable building. All help will
be appreciated so that this can be accomplished quickly. An e-mail
will be sent out by this evening or first thing in the morning with
an exact time.
Also, I wanted to make everyone aware of another excellent weather
website that is offering all kinds of radar/satellite tracking and
updates of the storm; it also provides a visual history of all previously
category 3, 4 & 5 hurricanes that have entered the Gulf in years
past and their related tracks. The site is:
www.wunderground.com
Take a moment to check-out it site. Simply click on the "Current
Tropical/Hurricane Tracking" image hear the top left corner and
a page with all types of radar and satellite images will appear; choose
the one you like and it will be enlarged.
Hope you find the site help.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium
***************************************************************************************
Date: August 29, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - "Boarding-up" of window
While we still await a clearer picture as to where Gustav will make
land falls, it currently appears that it will be well west of New
Orleans and that it will then track off to the northwest and some
most recent tracks show perhaps even to the west after land fall.
If this holds true, New Orleans may not experience much more than
minimal hurricane force winds. The water that this storm will be capable
of pushing into Lake will be another issue and major concern.
With that in mind, boarding of windows may be a bit premature. However,
if you are going to "board up", in keeping with your Rule,
Regulations and Covenants, please do so from the inside of your Unit
or keep any attachment point from the outside inside the perimeter
of the wood siding. ATTACHING TO THE COMMON AREA WOOD SIDING ON
THE EXTERIOR OF THE BUILDING/UNIT WINDOW IS PROHIBITED UNDER YOUR
RULES, REGULATIONS AND COVENANTS. Given the current circumstance
relative to the approaching storm and the number of Owners who may
have already evacuated, we will address any violation in this area
once the storm has passed and we have returned to a normal environment.
For now, we simply ask for everyone's volunteer compliance.
Thank you in advance for your cooperation regarding this matter.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium
***************************************************************************************
Date: August 28, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Hurricane Plan Overview availalbe on Pier
8 Website
As we watch Gustav over the next few days, now would be a good time
to review the "Hurricane Plan Overview" page of the Pier
8 Website. Simply go to the home page at www.pier8condos.com, click
on the "Hurricane Plan Overview" link and the page will
display.
The page offers information like the difference between a Hurricane
"Watch" and a Hurricane "Warning" along with suggested
action that you may want to consider when these are issued.
The page also offers insight to action that you may want to consider
within 48 hours of an approaching Category 3 or greater Hurricane;
this is the point that your Board and Management would begin physically
preparing the property for the approaching storm. There is an outline
of items that you will also want to consider regarding securing your
interior Unit(s) with a number of helpful reminders that you may not
consider at the last moment.
At the bottom of the page there are two "links" to national
weather websites that you can monitor the latest information relative
to any approaching storm(s).
At 48 hours prior to the approach of a Category 3 or greater Hurricane
that is expected to strike the New Orleans Area, Management will begin
to go into our "mobile mode". At that point, our main means
of communication will become the internet using our laptops and mobile
phones. We will be able to communicate with Owners who have provided
their e-mails and who check their e-mail regularly from that point
on. Notices/updates will be sent out via the mass e-mail feature of
the website we have developed for you. With that in mind, please plan
on checking your e-mail regularly and communicating with management
by sending us e-mails using info@pier8condos.com or my personal e-mail,
al@alcorgroup.com.
Please remember, if a mandatory evacuation order is issued by local
authorities, we will be securing/closing the property shortly following
any such order. If a decision is made to secure/close the property,
we will advise all Owners (via a mass e-mail) of the day and time
the property will be secured and considered closed. Remember, once
a mandatory evacuation order is given by authorities, we will more
than likely not be able to return for at least a day of two after
the storm has passed and authorities re-opening the city to citizens.
Thanks for taking a moment to review the Hurricane Plan Overview
now and please, don't wait until the last minute to make your plans,
begin making them now to ensure your safety and the safety of your
friends and family.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium
***************************************************************************************
Date: August 27, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - All Condo Documents that we have are now
availalbe on the Website
As you may know, we have been working to provide copies of complete
condo docs on the Pier 8 website. This morning, we have uploaded several
new documents for your use. The links to these documents are located
at the bottom on the Rules and Regulations page of the website. Here's
where we need your help.
Many of the documents that we have been able to assemble are of poor
"copy" quality at best. We are asking everyone's assistance
by checking your files and seeing if you have any better copies of
these various documents that you would be willing to share with us.
If so, please let us know as we would appreciate you lending them
to us to make a clear/clean copy that could then be shared with other
Owners and would-be Owners of Pier 8.
Thanks in advance for any assistance you may be able to offer.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium
***************************************************************************************
Date: August 27, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Condo Documents Available on Pier 8 Website
We have begun converting and uploading a complete set of Pier 8 Condo
documents to the Pier 8 Website at the bottom of the Rules and Regulations
page of the website. Admittedly, some of the copies that we have are
poor; they have been recopied over the years and some of the pages
are not totally readable. We are asking all Owners to search their
records in hopes of find clearer copies. If you find a clear/clean
copy of any of the documents that you see on the website, please,
please share those with us so that we can improve on the quality of
the documents on the site.
Thanks in advance for any assistance regarding this matter.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium
***************************************************************************************
Date: August 26, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Hirricane Plan Overview
Good Evening Pier 8 Owners:
With all this talk about the threat of Hurricanes, it was suggested
that we might want to remind everyone of the Hurricane
Plan Overview on the Pier 8 website. For those seeking a reminder
source, please take a moment to check out the page at: http://www.pier8condos.com/Hurricane%20Plan/hurricane%20overview.htmeveryone
If your are having problems using this link, simply go to www.pier8condos.com
and follow the links to the Hurricane Plan Overview page. There is
an additional link or two at the bottom of that page that we lead
you to some other related sites.
At any rate, wanted to let everyone know it was there and hope you
find it informative and helpful in some way.
If an evacuation is ordered and we do elect to evacuate, we (ALCOR)
will operate remotely from where ever we are and will broadcast updates
via the website mass e-mail system. With that in mind, please advise
everyone of this service and ask them to ensure that we have their
correct e-mail address. Obviously if they are receiving our e-mails
over the past few weeks we have it. If they have not seen these e-mails,
they need to call the office or drop me an e-mail and we will add
them to the system immediately.
This was very effective during Katrina at our other properties and
we were able to e-mail photos of the various properties to Owners
regardless of where they were.
As always, thanks for the support and please let us know if you think
we need to add something to the Hurricane
Plan Overview page.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium
***************************************************************************************
Date: August 25, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 - Elevator Work Notice/Security Camera &
System
Good Afternoon Pier 8 Owners:
We have confirmed the previously mentioned elevator work scheduled
for this Thursday morning, August 27, 2008 beginning at about 7:00
a.m. The plan is to "lift" both elevators and lock them
off above the ground floor level. A crew will then pump the elevator
pits out, trouble shoot the sump pumps that are obviously not working
and hopefully complete the needed repairs during this same day. Given
the uncertainty of what we may find, please plan on both elevators
being out of service until Friday morning. On Friday morning, Otis
will return to place them both back into service. We apologize for
any inconvenience this may create however, we must resolve this matter
before further damage occurs to the elevator resulting in potentially
more elevator repair bills for the Association. I will update on our
findings once we know where we are relative to this issue.
On a side note, I've had a few questions about the security system
relative to being able to view the cameras on your television sets;
something that appears to have existed prior Katrina. In checking
with Cox cable, this was previously accomplished using an analog signal.
Many of you are familiar with the industries conversion to digital.
Under a digital signal, Cox has advised that this would not be possible
at this point. Personally, I believe it is a mistake to allow the
cameras to be viewed on a free/open basis as it divulges what can
and can't be seen by the system; something you really wouldn't want
the wrong person to see. With that in mind, the system is currently
only available for review by myself as your property manager; no one
else has access to the system nor has anyone else been instructed
on its operation. Ultimately, we will be connecting to the system
via the internet but again, only the management office will access
the system when it comes to review and day-to-day management of the
system. Hopefully this answers recent questions on the subject but
if not, please feel free to contact me and I will answer any additional
questions regarding the system.
Should you require and additional information or have any questions
on this or any other Pier 8 related issue, please feel free to call
us at your earliest convenience. As always, thank you for your continued
support and patience as we continue our efforts in the weeks and months
ahead.
Sincerely,
Al Oglesby, CCIM, CPM®, CEA
Property Manager
Pier 8 Condominium
***************************************************************************************
Date: August 23, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Pier 8 -Update
Good morning Pier 8 Owners:
I wanted to advise everyone of the tentative elevator work scheduled
for Thursday morning August 28, 2008. Our elevator pits are holding
water that will damage equipment in the pit if the issue is not corrected.
With that in mind, we will have the elevators "lifted" Thursday
morning so that a crew can pump out the pits and determine what is
wrong with the sump pump system that was recently installed to keep
the pits dry. Hopefully, this will only take a few hours but it could
run longer, depending on what we find.
Also, while our policy is normally to disregard rumors, I wanted
to address a couple that have been brought to our attention by concerned
Owners; first, completion of renovations to the exterior of the buildings.
As you may know, there was/is an issue with the previous exterior
contractor. We are working to resolve the matter without further legal
expense to Pier 8. Once the matter is resolved, renovation of the
exterior buildings will be resumed. The delay is centered on the fact
that it would be a mistake to continue with those efforts until the
previous issue is resolved with the existing contractor. Our intentions
are to allow the contractor to complete the few remaining items, concluding
his contract and move on. Given the issues with the contractor, the
contractor will not be the involved with continued exterior renovation
activities under our management.
Secondly, as a few of you may know by now, and as we committed to
Pier 8 Owners when we assumed management responsibilities, we have
begun issuing initial and final warning and violation notices concerning
rules and regulation infraction at Pier 8. Notices involving illegal
signs, washer/dryer, pets and window coverings have been mailed and
received by several Owners during the past week. We want to be very
clear on this issue. Notices have also been sent to a couple of Board
members for apparent infractions. Rest assured, ALCOR's policy regarding
enforcement is one of equality; no one is exempt from the rules and
they will be enforced without prejudice.
Finally, so that all clearly understand our position on rumors in
the future, please be advised that we will not normally respond to
any rumors as it is simply time consuming and is generally a waste
of everyone's time that could be used to accomplish something constructive.
If any Owner has any question regarding any issue, please, take a
moment to call us and we will address the matter. Let's not allow
a few individuals who apparently enjoy spreading the rumors, then
standing back and watching the show. Majority of Pier 8 Owners who
that we have spoken with in the past two (2) months have obviously
had enough. As your managers, if we are not award of the matter/issue,
it must be a rumor and not worth wasting time on. Pier 8 is once again
moving forward in a positive direction and everyone who is assisting
in that effort is greatly appreciated by us and the majority of remaining
Pier 8 Owners interested in true progress and no more games.
Thank you for your continued support and patience as we continue
our efforts in the weeks and months ahead. ENJOY THE WEEKEND!
Sincerely
Al Oglesby, CCIM, CPM, CEA
Property Manager
Pier 8 Condominiums
*******************************************************************************************
Date: August 16, 2008
From: Al Oglesby, CCIM, CPM®,
CEA, Property Manager
Subject: Front Gate Access System is Up and Running Again!
Using the front gate access system
The front entry gate system has been re-activated
as of Friday evening, August 15, 2008. The system offers two basic
services, they are:
1. If an Owner arrives at the gate and does
not have their key, the gate can be opened by inserting the 4-digit
code provided by the Owner into the system. To use this service,
simply press the asterisk (*) followed by your 4-digit code and
the gate will unlock for approximately 10 seconds and will then
re-lock.
2. If a visitor arrives at the gate and wants to gain access,
they would find the Owner's/Tenant's name on the adjacent directory
board, press the "#" sign on the key pad; they will hear
a dial tone and should then enter the Owner's/Tenant's 2-digit code
found next to their name on the directory board. At that point,
the Owner's/Tenant's phone will ring and you can then speak to the
visitor. When satisfied with their identity, you simply press "#,
9" and the gate will unlock for approximately 10 second. IMPORTANT;
when you press the "#, 9", the phone will also hang up
and you will NOT be able to speak with the visitor again. I recommend
telling your visitor that you are going to unlock the gate and if
it does not unlock for some reason, simply call you again using
the system.
We have added all of the names that we are aware of related to
the various Units on the front gate directory board and thank Bob
Bassett for assisting us with that task Friday evening. If your
name is not on the directory board, please call the office (or e-mail
me) and provide us with the Unit number, name you wish to appear,
the phone number you wish to use (any local number, mobile or home
phone) and a 4-digit code and we will get it programmed into the
system within a few days. If you see your name on the Board but
the system does not work (gives you a "directory error"
message), that means we did not receive a phone number and/or 4-digit
code and your information was not programmed into the system.
There were a number of things that had to be completed to get
this system functioning again. On behalf of your Board and ALCOR,
we thank you for your patience regarding getting this system up
and running again and pledge continued improvements in the weeks
and months ahead at Pier 8.
Sincerely,
Al Oglesby, CCIM, CPM®,
CEA
Property Manager
Pier 8 Condominiums
*******************************************************************************************
Date: August 7, 2008
From: Al Oglesby
Subject: Drain Cleaning update
Good afternoon Pier 8 Owners:
The Board has purchased new pool furniture and will continue to improve
the common areas of the property. Once the furniture is set in place,
we ask that no one move the furniture around and to abide by the by-laws
that clearly state that Owners/Tenants cannot add or take items from
the common areas.
In addition, we received several complaints in recent days regarding
loud music and voices after pool hours. The pool closes at 11:00 pm
daily and there have been several people in the pool past midnight
in recent days. This is not only against the rules but has become
an issue with people who work on the weekend and need their rest.
We will be using security surveillance cameras and from this point
on, anyone at the pool passed 11:00 p.m. will be formally notified
of a violation and will be subject to being fined thereafter for each
infraction.
In past month or so that ALCOR has been involved at Pier 8, we have
heard from many Owners concerning the need to enforce your Rules and
Regulations for the good of the whole. As many of you that attended
the recent meeting heard me say, you have our commitment to doing
just that. It is unfortunate that we must continue to bring up "the
rules" and violations, however, rest assured that the problem
appears to be relatively contained to a hand full of individuals who
are less considerate of other Owner's rights to peacefully enjoy the
Pier 8 environment. We are making this last informal request to those
Owner's who are in violation or continue to repeatedly violate what
is basically the rights of other Owner's. Your Pier 8 Rules and Regulations
were created and aimed at promoting a development for all to enjoy.
With that in mind I ask for everyone's support and assistance; let's
not waste any more time on a hand full of Owner's who's only goal
appears to be creating disruption of what would otherwise be a great
and fun environment to live in.
Please be advised that some of other the most frequently reported
infractions involve, improper blinds or window coverings, parking
infractions, over sized pets, washer and dryers in Units etc. We will
begin formally addressing the individual issues over the next could
of weeks so we ask that anyone currently in violation of these (or
other) rules please make arrangements to correct the issue as we would
rather spend our time on improving Pier 8 in other areas.
If you are in support of this approach, please drop us a "reply"
e-mail by simply saying "I agree". We need to know that
the majority of Owners are tired of the games and wish to move on
if we are going to be affective in our efforts.
Thanks again in advance for your support and assistance in returning
Pier 8 to its pre-Katrina status in the weeks and months ahead.
Sincerely,
Al Oglesby, CCIM, CPM, CEA
Property Manager
Pier 8 Condominiums
*******************************************************************************************
Date: July 31, 2008
From: Al Oglesby
Subject: Drain Cleaning update
Good morning Pier 8 Owners:
While the cleaning of all subsurface drain lines in and around Pier
8 was completed yesterday, there are issues that will need to be address
before the system can perform as originally intended.
The front patio drains serving Units 101 - 105 was cleared and should
flow well. The drains serving Unit 106 - 109 while cleared, will require
repairs to the section of line damaged by the previously mentioned
fence pole.
The entrance side of the parking around tot eh rear of the lot should
drain significantly better however, those drains have settled dramatically
over the years and "reverse flow" is evident. The lines
also have some concrete reducing the size of the line in various sections.
There is no simple or easy "fix" for this condition.
The drains on the exit rear and side of the property are clear with
exception of a section from the about the exit gate to the first drain
near the street. A good portion of the opening in the drain line (along
this section) appears to be blocked by concrete that could not be
removed. This section will need to be replaced before any major improvement
in drainage along that area will be seen.
For now, we will want to see how the system works over all during
the next hard rain noting the biggest problem areas. Any feedback
(observations) by Owners concerning specific areas (relative to drainage)
would be welcome and helpful.
Thank you for your patience over the past few days and we will provide
note worthy updates on this issue as it develops.
Sincerely,
Al Oglesby, CCIM, CPM, CEA
Property Manager
Pier 8 Condominiums
****************************************************************************************
Date: July 29, 2008
From: Al Oglesby
Subject: Drain Cleaning update
Good evening Pier 8 Owners:
As many of you know, this morning we tackled the front drain issue,
specially the drains serving the front ground floor units with within
the fenced in areas.
First, we found the drain line that empties into the drain "box"
in the exit drive lane about 75% plugged with concrete. We were successful
in getting that removed. We proceed to clean the line from Unit 109
towards the entrance awning. We struck what ended up being a steel
fence post. Apparently, when the fences (and poles were re-installed
in that area, the installer penetrated the drain pipe with a pole
and cemented it in place literally blocking the drain; after about
an hour, we were able to remove the pole and the drain line will need
to be repaired. We may in fact install and additional drain at that
point to resolve this issue.
Needless to say we got caught by the rain and were unable to proceed.
I have tentatively schedule the crew back for tomorrow morning at
7:00 am and ask that the ground level Unit Owners leave the gates
unlocked again tomorrow morning. Weather permitting, we will be back
the in the morning to continue working to clear all drains.
On a side note, we have also contacted the city and advised that
they may have a blockage in the main line towards Mariners Cove; ticket
# 2042775 has been opened on this issue and the damaged storm drain
near the entrance lane on Lake Marina Drive. If we don't see them
working within the next few days, I may need a few people to call
right after it rains to tell them of you concern for flooding due
to the main line blockage; their number is 658-2299. Don't mention
the work order number simply give them the address and express your
concern for potential flooding of the ground floor Units; that will
get their attention.
Thanks for the help and we will given you and update on this issue
in the next day or two.
Sincerely,
Al Oglesby, CCIM, CPM, CEA
Property Manager
Pier 8 Condominiums
**************************************************************************************
Date: July 29, 2008
From: Al Oglesby
Subject: Front Patios - Scheduled Drainage repairs
Good morning Pier 8 Owners:
As mentioned in last week's mass e-mail, we will be on-site this
morning attempting to clean at least the front drain system serving
the fenced in patio areas in an effort to prevent the potetnial of
flooding those units during heavy rains; a separate e-mail was sent
to those Owners yesterday reminding them to unlock patio gates. Remember,
you will more than likely need to exit the main gate during this operation
as the equipment to complete this task will be positioned in the exit
drive lane of Pier 8.
There is severe weather approaching this morning from the southeast
so we will do what we can before it gets here. If we are rained out,
we will reschedule and advise everyone accordingly. An update will
be provided to you later today relative to any progress made.
In the meantime, we have about 42 e-mail addresses in the system
now. As you speak to other Owners, please ask them to give the office
a call if they have not been receiving our e-mails in the past week
and ask them to provide us with an e-mail address.
Thanks for the help.
Sincerely,
Al Oglesby, CCIM, CPM, CEA
Property Manager
Pier 8 Condominiums
*****************************************************************************************
Date: July 28, 2008
From: Al Oglesby
Subject: Frotn Patios - Scheduled Drainage repairs
Good evening:
This e-mail is going out to the six (6) Owners for whom we have e-mails
addresses and who own ground level Units with enclosed patios along
the front of Pier 8. The drain cleaning company just called and confirmed
that they are in fact set to arrive at Pier 8 for 7:00 a.m. tomorrow,
Tuesday, July 29th to clear the drains and gutter boxes serving those
patios. In order to be successful, we need everyone that has a lock
on their patio gate to leave it unlocked tomorrow morning before you
leave so that we can access those patios with drain boxes in them.
If we are not able to access those areas, the drains cannot be cleaned.
We are still attempting to make contact with Units 103, 108 and 109
and would appreciate any assistance if you should happen to know or
see them this evening.
Pleas assist us in solving this long standing problem; leave your
patio gates unlocked for tomorrow's operation. Should you require
any additional information regarding this or any other Pier 8 matter,
please call.
Sincerely,
Al Oglesby, CCIM, CPM, CEA
Property Manager
Pier 8 Condominiums
************************************************************************************
Date: July 25, 2008
From: Al Oglesby
Subject: Scheduled Drainage repairs
Good morning Pier 8 Owners:
We need the help of a few Owners next week. We are attempting to
schedule the cleaning of the storm drains in the "interior"
parking lot drive lanes that surround the property and the drains
located across the front of the property inside the fenced patio areas.
We are targeting Tuesday or Wednesday and I am awaiting confirmation
from the company that will do the work. This of course is subject
to change depending on weather.
After surveying the situation after yesterday's rain, we believe
there will be a need to block the exit drive for some time as the
drain that we need to enter into for the patio cleaning operation
is directly in the drive lane. Understanding that this will take a
few hours to complete, we are asking everyone to use the main entrance
gate as the exit during this time as the entire normal exit lane will
be blocked with equipment to complete this task.
With that in mind, we will need access to all fenced in areas across
the front of the property. I will send a second e-mail (probably on
Monday) to confirm the exact date and time of the service I noticed
locks on a few of them and wanted to give those Owners a "heads-up"
to need for access.
Thanks in advance for your assistance, patience and understanding
as we resolve yet another long standing issue at Pier 8 and other
issues on the list of things to be address in the weeks ahead.
Sincerely,
Al Oglesby, CCIM, CPM, CEA
Property Manager
Pier 8 Condominiums
************************************************************************************
Date: July 22, 2008
From: Board of Directors
Subject: July 21, 2008 Special Board & Owners' Meeting
Thank each of you who attended the homeowners' meeting on Monday.
With Al and Tina on board as our property managers, we can be assured
that Pier 8 Association is going to move forward as a team for the
betterment of its members and improved homeowners property value.
We encourage everyone to be part of the progress and discontinue the
disruptive activity that has occurred in the past. As a condo association,
it is expected that all tenants,. homeowners and guests treat one
another with respect and courtesy. The by-laws provide for that and
any disturbances will be dealt with accordingly.
We look forward to a new and improved Pier 8.
Pier 8 Board of Directors
************************************************************************************
July 9, 2008
Good morning Pier 8 Owners:
A Special Board/Owner's meeting has been set for 6:30 p.m., Monday
July 21, 2008 at the Knights of Columbus Meeting Hall, 1427 Seminole
Ave. in Bucktown; this is the same location that has been used for
past meetings. Attendees can enter the location from Carrollton Avenue
(at Ash St.) behind St. Louis King of France School. A formal notice,
along with proxy form and map to the Knights of Columbus Hall, will
go out to all Owners in today's mail.
I strongly encourage Owner's to attend this very important meeting.
My goal relative to this meeting is simple; meet as many Owners as
possible, address some of the most important issues facing Pier 8
as an Association (including the recent petition issue) and most importantly,
have a productive orderly meeting so that we can join together in
our now common effort of moving Pier 8 Condominium ahead in a positive
direction from this point on.
Thanks in advance for you attendance (if at all possible) and I look
forward to seeing as many Owner's as possible at the meeting.
YOUR Property Manager
Al Oglesby, CCIM, CPM, CEA
The ALCOR Group, L.L.C.
*******************************************************************************************
July 1, 2008
TO: All Owners
FROM: Al Oglesby, Property Manager
RE: Pier 8 - Upcoming Special Owner's Meeting
Good morning Pier 8 Owners:
By now, hopefully many of you have received our initial letter formally
advising everyone of the change in management companies at Pier 8
effective June 23, 2008.
While I understand that there are many issues to be addressed at
Pier 8, I ask everyone's assistance by being patient during the next
several days while we complete this transition. While progress has
been slower than most of us would have liked following the Katrina
event, together we can overcome the remaining issues and return Pier
8 to at least its pre-Katrina days and hopefully excel beyond that
level.
You have my commitment to having a Special Owner's meeting in the
week couple of weeks wherein many of these issues can be addressed
along the needed input of Owners.
Thanks you in advance for patience cooperation and understanding
over the following several days. In the meantime, if there is something
that we can assist you with, please do not hesitate to call our office.
YOUR Property Manager
Al Oglesby, CCIM, CPM, CEA
The ALCOR Group, L.L.C.
******************************************************************************************
June 24, 2008
TO: HOMEOWNERS
FROM: BOARD MEMBERS
RE: UPDATES
The Board is pleased to announce that Ms. Cheryl Wagers has been appointed
by the Board to fill the President's position. We thank her for her
commitment and look forward to working with her.
We have also selected a new Property Manager. The firm is The ALOR
Group and your new property manager is Al Oglesby. Al brings a wealth
of experience, knowledge and professionalism to Pier 8. He will be
sending each homeowner a letter of introduction. In the meantime,
please send your July monthly fees and assessment amounts to Dalton
Truax, III. The management change is effective tomorrow.
As most of you know, there is a petition to recall the Board. Many
homeowners have concerns with the way this was handled and, if you
want to remove your name, please call or email one of the Board Members.
We understand that false information was provided to homeowners. We
appreciate your support.
The Board